Medium-term management plan and SDGs

Medium-term Management Plan (FY2021-FY2025)

~ A period of contributing to the achievement of the SDGs and transforming society towards a new future ~

To fulfill NEXCO EAST Group 's social mission, we are working together as a group to implement this plan based on our "Six Basic Policies," aiming to grow as a company that contributes to all stakeholders and to create sustainable Expressway that will connect to the future.

Image of 6 basic policies

Basic policy and specific Expressway projects

Basic Policy 1: Realizing safe, secure, and comfortable Expressway that are compatible with innovations such as automated driving

theme Business Objectives Main measures
safe and secure Improving safety through accident prevention measures and ensuring convenience through congestion countermeasures
  • Wire rope installation in the temporary two-lane section and trial and verification of new technologies
  • Promotion of additional lane projects and pacemaker lights
Innovation
Responding to
Developing road space to accommodate innovations such as autonomous driving
  • Real-time full-line monitoring demonstration experiment
Promoting the moVision project
  • Considering mobility hubs utilizing PAs and roadside stations
  • Preparation of experimental equipment for non-contact power supply during outages

Basic Policy 2: Dramatically improve the reliability of Expressway infrastructure against aging and disasters

theme Business Objectives Main measures
Measures against aging Measures to combat aging and full-scale preventive maintenance
  • Promoting renewal work on bridges, tunnels, etc.
Disaster response Rapid restoration of transportation functions through earthquake-resistance measures
  • Accelerating earthquake reinforcement measures in areas where the probability of a large-scale earthquake occurring is 26% or higher
Responding to increasingly severe and frequent meteorological disasters
  • Publicizing preventive road closures, concentrated snow removal, and sections where roads may be closed or refrained from traffic
  • Transition to road closure criteria that take into account soil precipitation index

Basic Policy 3: Improving network functions by developing and strengthening Expressway and promoting four-lane expansion

theme Business Objectives Main measures
network
Enhancements
Consideration of strengthening road networks and promotion of development
  • Development of Expressway networks and promotion of four-lane roads
Promoting the development of smart ICs and rest facilities to make Expressway more user-friendly
  • Development of smart ICs and rest facilities

Basic Policy 4: Pursuing ease of use based on diverse customer needs

theme Business Objectives Main measures
Comfortable and convenient Strengthening and expanding SA/PA service functions to respond to customer needs, changes in behavior, and securing future workers
  • Commercial facility renovation
  • Walk-in gate maintenance
  • Providing 24-hour service with unmanned vending machines
Countermeasures against congestion at rest areas in response to the 2024 logistics problem / Review of late-night discounts
  • Verification of short-term parking spaces
  • Construction of double-linked truck parking stalls
  • Review of late night discount
Toll initiatives to promote Expressway use and distribute traffic
  • Conducting a social experiment on ETC time-based tolls on Tokyo Wan Aqua-Line Expressway
  • Social experiment of commuter passes to be conducted in some sections of Hokkaido and Niigata Prefecture
  • Planning and sales of Dorawari

Basic Policy 5: Strengthening the management capabilities of the entire Group to contribute to the realization of a sustainable society

theme Business Objectives Main measures
Environmental protection Formulation of the "NEXCO EAST Group Carbon Neutral Promotion Strategy"
  • Minimizing energy consumption by switching to LED lighting
  • Biomass gasification power generation using plant-derived materials
  • CO2 absorption and fixation through Expressway slope planting
  • Development of rapid chargers in preparation for the shift to EVs

Basic Policy 6: Strengthening human resources to respond to social changes and establishing a foundation where everyone can work with enthusiasm

theme Business Objectives Main measures
Work environment Strengthening human resource development to enable each employee to maximize their abilities and skills
  • Formulation of the "NEXCO EAST Human Resources Development Policy"
Addressing the 2024 Construction Industry Problem
  • Creation of "Guidelines for Facilitating Construction Work" to resolve the growing shortage of workers

Financial plan

Expressway business

Current Medium-Term Management Plan period cumulative

Image of Expressway business profit and loss plan
Image of Expressway Project Investment Plan

Related business

Current Medium-Term Management Plan period cumulative

Image of profit and loss plan for related businesses
Image of investment plans for related businesses