East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • Japanese
  • English
  • 简体 中文
  • 繁體 中文
  • ภาษา ไทย
  • 한국어

Typhoon No. 19 of [E18] due to the influence Joshin-Etsu Expressway for face-to-face way of (Usui Karuizawa IC ~ Saku IC) (2020 January 28 update)

Due to Typhoon No.19E18About face-to-face traffic of Joshin-Etsu Expressway (Usui Karuizawa IC-Saku IC) (updated on January 28, 2020)

October 25, 2019
East Nippon Expressway Co., Ltd.
Kanto office

E18Joshin-Etsu Expressway between Usui Karuizawa IC ~ Saku IC, due to the impact of typhoon No. 19, but had been carrying out closures, and emergency construction work is completed in the local, 2019 on October 23 at 6:00 The road closure has been lifted, and you can now travel by face-to-face traffic (one lane each for upper and lower lanes).

When traveling, please follow the cautions on traffic and drive safely.

In addition, traffic congestion is expected due to heavy traffic during the morning and evening hours on weekdays and especially on weekends. When leaving, be sure to leave your time and check the latest traffic information.

In addition, 2020 We will inform you that we will aim to restore 4 lanes before Golden Week.

We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation.

In addition, 2020 January 14, from (Tuesday), the speed regulation section we become the change, please note.

1 Regulatory status (schematic diagram)

Regulatory status (schematic diagram)

2 Notes on passage

  • [1] The two-lane section on one side is temporarily operated with one-lane one-sided traffic.
  • [2] Implement a speed regulation of 50 km / h. Please observe local regulations and ask for your cooperation in safe driving.
  • [3] At the end of the traffic jam, turn on the hazard lamp at the end of the traffic jam and signal the following vehicle to help prevent collisions.
  • [4] The suspension of traffic is lifted as an emergency measure, and the standards for closing traffic for rainfall etc. have been provisionally reduced to ensure traffic safety (see the table below). Please confirm the latest traffic and weather information.

Rainfall closure standards (Joshinetsu Expressway Usui Karuizawa IC-Saku IC)

  Continuous combination
Normal criteria 190㎜ 110㎜ ・ 40mm / 1h
Interim standard 100㎜ 70㎜ ・ 30mm / 1h
  • [5] Depending on the construction-related vehicles, there may be temporary low-speed driving times.

3 One-lane one-lane two-way traffic image

[Face-to-face traffic] (1 lane for each side)

Face-to-face image

4 Congestion prediction

Predict the occurrence of traffic jams. Please see here for the detail.
We apologize for any inconvenience, but we ask for your understanding and cooperation.

Prediction of congestion from regulated part

Prediction of congestion from regulated part

Latest traffic conditions

Download Adobe Reader
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not haveDownload from here (free)External link: Another window display してご利用ください。