East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • Japanese
  • English
  • 简体 中文
  • 繁體 中文
  • ภาษา ไทย

"Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"

"Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"

2019 October 23
East Nippon Expressway Co., Ltd.
Kanto office

E18Due to the impact of typhoon No. 19 between Usui Karuizawa IC and Saku IC on Joshin-Joshin-Etsu Expressway, it is currently operating in face-to-face traffic (upper and lower lanes) using the In-bound line. .

4 for the early of traffic resumed in the lane, "according to the experts Joshin-Etsu Expressway, Nagano Expressway in Slope measures and Technical Review Board", and to consider this recovery method of the relevant section (Usui Karuizawa IC ~ Saku IC) The 1st Technical Review Meeting will be held as follows.

1 date and time

Technical Review Committee 2019 scheduled for mid-November 1st (The date will be announced as soon as it is determined.)

2 places

East Nippon Expressway Co., Ltd. Saku Administrative Office Meeting Room

3 committee members

Attachment【PDF: 39KB】Link to PDFAs of

4 proceedings

  • Damage situation, cause
  • Study of this restoration method
  • Monitoring system, etc.

5 Other

  • The study meeting will be held privately.
  • After the study meeting, the results will be announced.

Annex

Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)External link: Another window display してご利用ください。