East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • Japanese
  • English
  • 简体 中文
  • 繁體 中文
  • ภาษา ไทย
  • 한국어

[E14] Between Tateyama Expressway Futtsu Chuo IC and Futtsu Takeoka IC
4 lanes on March 6 (Fri)

E14Tateyama Expressway Futtsu Chuo IC and Futtsu Takeoka IC
4 lanes on March 6 (Fri)

For the latest regulatory information,DraTraExternal link: Another window displayPlease see

2020 February 7
East Nippon Expressway Co., Ltd.
Kanto office

NEXCO EAST Kanto Regional Head Office (Omiya Ward, Saitama City)E14Tateyama Expressway for the four-lane construction work that we have proceeded in (hereinafter referred to as the "Michi Tateyama") Futtsu central Interchange (hereinafter referred to as "IC") - Futtsu Takeoka between the IC (7.0km), 2020 March 6 (Friday ) Four lane operation is expected to start around 3:00 pm

As a result, the entire section (20.7km) from Tateyama Road Kisarazu Minami Junction (JCT) to Futtsu Takeoka IC will have four lanes.

During the construction period, thank you for your understanding and cooperation with traffic regulations for a long time.

1 position map

Location map

Geographical Institute Map (Geographical Survey Institute (https://maps.gsi.go.jp/External link: Another window display)NEXCO EAST Is processed

2 Schematic of the 4 lane operation start section

On the Tateyama Road between Kisarazu Minami JCT and Futtsu Takeoka IC (20.7 km), four lanes are operated between Futtsu Chuo IC and Futtsu Takeoka IC (7.0 km) around 3:00 pm on Friday, March 6, 2020 to start.

As a result, the entire Tateyama Road becomes four lanes.

Before 4 lanes

■ Effects of using Tateyama Road 4 lanes"Attachment"【PDF: 862 KB】Link to PDFreference

Download Adobe Reader
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not haveDownload from here (free)External link: Another window display してご利用ください。