East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • 日本語
  • English
  • 简体中文
  • 繁體中文
  • ภาษาไทย
  • 한국어

【E7】 Nihonkai-Tohoku Expressway With pavement repair work of
About implementation of nighttime traffic closure

E7Nihonkai-Tohoku Expressway With pavement repair work of
About implementation of nighttime traffic closure

- Niigata Airport (Niigata Kuokou) IC ~ Arakawa Tomaiuchi (Not at all) Inter-IC (Upper and Lower) -

August 24, 2017
East Nippon Expressway Co., Ltd.
Niigata office

NEXCO EAST Niigata branch (Niigata city Chuo Ward), in order to make it possible for customers to use the expressway safely, securely and comfortably,E7Nihonkai-Tohoku Expressway Between the Niigata Airport Interchange (IC) and the Arakawa Bounty IC, we will carry out night traffic closures associated with pavement repair work.

We are sorry for the inconvenience to our customers, but we ask for your understanding and cooperation.

Duration and duration of nighttime traffic closure

日本海東北自動車道 新潟空港IC ~ 荒川胎内IC間(上下線)

section (1) Niigata Airport IC - Seiro Shibata IC (Upper and Bottom Line) (2) Seiro Shibata IC - Arakawa Tainai IC (vertical line)
period (1)9月25日(月) 【1夜間】 (2) September 26 (Tuesday)-September 29 (Fri) [4 nights]

Reserve date: October 2 (Mon)-October 6 (Fri)

時間

Every night from 20:00 to 6:00 the next morning

内容

Pavement repair work, road conservation construction

Remarks (1) Toyoei SA ( Out-bound ) closes at 19:00.
The Toyoei Smart IC ( Out-bound ) closes at 19:00.
 
* Weather conditions may change due to weather conditions.
※ We do not carry out at night and bad weather on Saturday, Sunday.
※ Closing stop section and detour route, construction place Please see the back side for the position diagram.
※ For information on road traffic information etc.Attachment 1【PDF: 106KB】Link to PDF
※ For adjustment of transfer charges due to traffic closureAttachment 2【PDF: 120 KB】Link to PDF

Closing stop and detour

Closing stop and detour
(1) Niigata Airport IC ⇔ Holy basket Shibata IC (2) Holy basket Shibata IC ⇔ Arakawa intrathecal IC
Expressway About 15 minutes About 20 minutes
Use National Highway No. 7 (New New Bypass) About 20 minutes About 30 minutes

Construction location location map

Construction location location map
Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)External link: Another window display してご利用ください。