East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • 日本語
  • English
  • 简体中文
  • 繁體中文
  • ภาษาไทย
  • 한국어

【E49】 Ban-Etsu Expressway (Yasuda IC to Aizuwakamatsu IC)
Notice of night-time closing due to pavement repair work etc.

E 49Ban-Etsu Expressway (between Yasuda IC and Aizuwakamatsu IC)
Notice of night-time closing due to pavement repair work etc.

September 11, 2017
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office · Niigata Regional Head Office

NEXCO EAST Tohoku Branch (Sendai-shi Aoba-ku) and Niigata branch (Niigata-shi Chuo-ku), in order to make it possible for customers to use expressways safely, securely and comfortably,E 49We will carry out nighttime traffic closure in the face-to-face traffic section accompanied by pavement repair work, tunnel equipment inspection, etc. between Yasuda IC and Aizuwakamatsu IC of the Ban-Etsu Expressway .

Although it is very troublesome for customers, it is necessary work to use the Expressway safely and comfortably, so please understand and cooperate.

Ban-Etsu Expressway night-time traffic stop (16 nights)

Route Ban-Etsu Expressway Underline
section (1) Yasuda IC - West Saizu IC (2) Between Tsugawa IC and West Aizu IC
Implementation period October 10 (Tuesday) to October 13 (Friday) and
October 16 (Mon) [5 nights]
Reserve date: October 17 (Tuesday) to October 20 (Friday)
October 17 (Tuesday)-October 18 (Wednesday) [2 nights]
Reserve date: October 19 (Thu) to October 20 (Fri)
Time 20: 00 - 6: 00 the next morning
Regulatory content Nightly closure
Construction contents Pave repair work and maintenance repair work
Remarks
  • The Aganogawa SA closes at 19:00 on both the up and down lines.
    Kamikawa PA, Nishi Azu PA will close at 20:00 on both the up and down lines.
  • Depending on the weather, the regulation period / time may be changed or canceled.
  • Information on other construction regulations etc. will be announced at our HP "Dora Tora" from time to time.
  • Kamikawa PA, Nishi Azu PA will close at 20:00 on both the up and down lines.
  • Depending on the weather, the regulation period / time may be changed or canceled.
  • Information on other construction regulations etc. will be announced at our HP "Dora Tora" from time to time.
Route Ban-Etsu Expressway Underline
section (3) Between the West Aizu IC and the Aizusaka-shitsu IC (4) Between Aizusaka-shima IC and Aizuwakamatsu IC
Implementation period October 23 (Mon)-October 26 (Thu) [4 nights]
Reserve date: October 27 (Fri)
October 30 (Mon)-November 1 (Wed) and
November 6 (Mon)-November 7 (Tuesday) [5 nights]
Reserve date: November 8 (Wed)-November 9 (Thu)
Time 20: 00 - 6: 00 the next morning
Regulatory content Nightly closure
Construction contents Tunnel equipment inspection and maintenance work
Remarks
  • The West Aizu PA closes at 20:00 on both the up and down lines.
  • Depending on the weather, the regulation period / time may be changed or canceled.
  • Information on other construction regulations etc. will be announced at our HP "Dora Tora" from time to time.
  • Shin-crane PA closes at 20:00 on both the up and down lines.
  • Depending on the weather, the regulation period / time may be changed or canceled.
  • Information on other construction regulations etc. will be announced at our HP "Dora Tora" from time to time.

Closing stop and detour

Closing stop and detour

Road closure implementation period

Road closure implementation period
  • Regarding the adjustment of the transfer charge accompanying the passage closingAnnex【PDF: 810KB】Link to PDF

Construction summary

We will repair damaged road surface between Ban Koshige Yasuda IC and Aizuwakamatsu IC, perform inspection and cleaning work of tunnel equipment.

In order to reduce the impact on customers as much as possible, we will shut down at night on weekdays with little traffic, and carry out construction and other activities intensively and efficiently.

 お客さまに安全・快適に高速道路をご利用いただくため、ご理解とご協力をお願いします。

  • Repair of paved road surface (between Yasuda IC and Mikawa IC)
    Repair of paved road surface (between Yasuda IC and Mikawa IC)
  • Repair of paved road surface (between Tsugawa IC and West Aizu IC)
    Repair of paved road surface (between Tsugawa IC and West Aizu IC)
  • Inspection and repair of tunnel inside structure
    Inspection and repair of tunnel inside structure
  • Cleaning of lane separation mark
    Cleaning of lane separation mark

Information on road traffic information

  • The site full of convenient information on Expressway nationwide " DraPla "
    【address】
    PC versionExternal link: Another window display
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Traffic information provision service of Expressway "Drive traffic ( DraTra )"
    We provide real-time road traffic information and traffic jam prediction.
    【address】
    PC versionExternal link: Another window display
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO EAST Customer Center
    An operator will be available 24/7.
    【phone number】
    0570-024-024 or 03-5338-7524
  • Highway telephone
    Real-time traffic information (5 minutes update) can be obtained by telephone 24 hours a day.
    【phone number】
    025-286-1620 (Niigata Bureau)
    024-961-1620 (Koriyama Bureau) From the mobile phone "# 8162"
    * It is connected to the nearest information center from anywhere in the country.
    【URL】
    PC versionExternal link: Another window display
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)External link: Another window display してご利用ください。