East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • 日本語
  • English
  • 简体中文
  • 繁體中文
  • ภาษาไทย
  • 한국어

【E49】 Ban-Etsu Expressway (between Niigata Central JCT and Aizuwakamatsu IC)
Notice of night-time closing due to pavement repair work etc.

E 49Ban-Etsu Expressway (between Niigata Central JCT and Aizuwakamatsu IC)
Notice of night-time closing due to pavement repair work etc.

The latest regulation information,DraTraExternal link: Another window displayPlease see.

2019 April 12
East Nippon Expressway Co., Ltd.

NEXCO EAST (Chiyoda-ku, Tokyo), in order to make it possible for customers to use expressways safely, securely and comfortably,E 49We will carry out nighttime closing with pavement repair work etc. between Ban-Etsu Expressway Niigata Chuo Junction (JCT) and Aizuwakamatsu Interchange (IC).

Although it is very troubling to our customers, it is necessary construction to use the Expressway safely and comfortably. We will continue to work to minimize inconveniences to our customers, so we ask for your understanding and cooperation.

Ban-Etsu Expressway night pass closed (33 nights)
Route Ban-Etsu Expressway Underline
section (1) Between Niigata Central JCT and Yasuda IC (2) Between Yasuda IC and Nishi Aizu IC
Implementation period May 13 (Mon)-May 17 (Fri) 【5 nights】
Reserve date: May 20 (Mon)-May 24 (Fri)
May 27 (Mon)-May 31 (Fri) [5 nights]
Reserve date: June 3 (Mon)-June 7 (Fri)
Time 20: 00 - 6: 00 the next morning
Regulatory content Nightly closure
Construction contents Pavement repair work, maintenance repair work
Remarks ※ Niigata parking area (PA), Aisen PA will be closed at 19:00 on both the up and down lines. ※ The Agano River service area (SA) will be closed at 19:00 on both the up and down lines.
Kamikawa PA (upper and lower lines) and Nishi Aizu PA ( In-bound lines) will both close at 20:00.
The confluence from Nishiaizu PA ( Out-bound line) to the main line (to Niigata) will close at 20:00.
Route Ban-Etsu Expressway Underline
section (3) Between Tsugawa IC and Nishi Aizu IC (4) Between Nishi Aizu IC and Aizu Wakamatsu IC
Implementation period June 3 (Mon)-June 7 (Fri),
June 10 (Mon)-June 14 (Fri) 【10 nights】
Reserve date: June 17 (Mon)-June 21 (Fri)
June 24 (Mon)-June 28 (Fri),
July 1 (Mon)-July 5 (Fri),
July 8 (Mon)-July 10 (Wed) [13 nights]
Reserve date: July 11 (Thu) to July 12 (Fri),
July 16 (Tuesday)-July 18 (Thu)
Time 20: 00 - 6: 00 the next morning
Regulatory content Nightly closure
Construction contents Pave repair work, tunnel equipment construction and maintenance repair work
Remarks ※ Kamikawa PA (upper and lower lines) and Nishi Aizu PA ( In-bound lines) will both close at 20:00.
The outflow from Nishiaizu PA ( Out-bound line) to the main line (to Niigata) will close at 20:00.
※ Nishiaizu PA ( Out-bound ) and Shintsuru PA (up and down line) will both close at 20:00.
The outflow from Nishiaizu PA ( In-bound ) to the main line (towards Fukushima) closes at 20:00.
※ We may suspend work or cancel work if there is a risk of worsening or worsening the weather.DraTraExternal link: Another window displayPlease check the latest information by "etc."

Closing stop and detour

Closing stop and detour

Road closure implementation period

Road closure implementation period

※ For adjustment of transfer charges due to traffic closureAnnex【PDF: 845KB】Link to PDF

Construction summary

Repair of damaged road surface between Banetsukigami Niigata Central JCT and Aizuwakamatsu IC, construction, inspection and cleaning work of tunnel equipment in the simplified median stripe will be carried out.

In order to reduce the impact on customers as much as possible, we will shut down at night on weekdays with little traffic, and carry out construction and other activities intensively and efficiently.

We ask for your understanding and cooperation so that customers can use the Expressway safely and comfortably.

  • Pavement road conditions (between Yasuda IC and Mikawa IC)
    Pavement road conditions (between Yasuda IC and Mikawa IC)
  • Pavement road conditions (between Aizu-sakaita IC and Aizuwakamatsu IC)
    Pavement road conditions (between Aizu-sakaita IC and Aizuwakamatsu IC)

Information on road traffic information

  • The site full of convenient information on Expressway nationwide " DraPla "
    【address】
    PC versionExternal link: Another window display
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Traffic information provision service of Expressway "Drive traffic ( DraTra )"
    We provide real-time road traffic information and traffic jam prediction.
    【address】
    PC versionExternal link: Another window display
    Mobile version (http://m.drivetraffic.jp/)
    スマートフォン版 ( http://www.drivetraffic.jp/smp/ )
  • NEXCO EAST Customer Center
    An operator will be available 24/7.
    【phone number】
    0570-024-024 or 03-5338-7524
  • Highway telephone
    Real-time traffic information (5 minutes update) can be obtained by telephone 24 hours a day.
    【phone number】
    025-286-1620 (Niigata Bureau)
    024-961-1620 (郡山局)  
    From the mobile phone "# 8162"
    * It is connected to the nearest information center from anywhere in the country.
    URL:
    PC versionExternal link: Another window display
    モバイル版 ( http://m.driveplaza.com / )
    スマートフォン版 ( http://www.driveplaza.com /smp/ )

※ Twitter's official account " NEXCO EAST (Niigata Drive)" (@ e_nexco_ niigataExternal link: Another window display)」、
" NEXCO EAST (Tohoku)" (@ E_nexco_tohokuExternal link: Another window displayHowever, information is delivered.

Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)External link: Another window display してご利用ください。