East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • 日本語
  • English
  • 简体中文
  • 繁體中文
  • ภาษาไทย
  • 한국어

【E49】 Ban-Etsu Expressway Tohiki three spring IC lamp part
Implementation of night closure

E 49Ban-Etsu Expressway Tohiki three spring IC lamp part
Implementation of night closure

The latest regulation information,DraTraExternal link: Another window displayPlease see.

2019 June 17
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Koriyama Administration Office

NEXCO EAST Koriyama Administration Office (Koriyama city, Fukushima Prefecture)E 49Ban-Etsu Expressway We will carry out a night-time closing as follows for repair work of pavement that was damaged at Tohiki Miharu Interchange (IC).

In order to minimize the impact on traffic, we will shut down at night when traffic volume is decreasing. We apologize for any inconvenience to our customers, Expressway Work required to maintain a safe and comfortable environment.

We will continue to work to minimize inconveniences to our customers, so we ask for your understanding and cooperation.

1 閉鎖箇所   Annex 1] [PDF: 322KB]Link to PDF

[1] Tohiki Miharu IC Niigata area entrance (Out-bound line)
[2] Tohiki Miharu IC Iwaki direction entrance (In-bound line)
[3] Tohiki Miharu IC all directions entrance (upper and lower lines)

2 Closed date and time

  • 【1】 2019 July 16 (Tuesday) to 24 (Wednesday) 20:00 to 6:00 7 Next night
  • 【2】 2019 July 25 (Thu)-29 (Mon) 20:00-6:00 3 3 night time
  • [3]2019 July 30 (Tuesday)-August 2 (Fri) 20:00-6:00 4 Next night
    ([1] [2] [3] reserve date:2019 August 5 (Mon)-7 (Wed), August 19 (Mon)-September 6 (Fri))
    We will make a rainy schedule, but if there is a risk of heavy rain and strong wind we will postpone.
    In addition, conduct judgment of night closing is performed at 16:00 on the day of the operation.
  • July
  • Aug
  • As a rule, construction will not be conducted on Sundays and public holidays.
  • Because we may change regulatory period depending on weather etc, when usingConstruction only websiteOr 'DraTraExternal link: Another window displayPlease check the latest information through websites such as

3 Detour

Route 288, Route 349 【Annex 2] 【PDF: 282KB】Link to PDF

4 Construction contents

We will repair damaged pavements.

  • Before construction
    Before construction
  • After construction (image)
    After construction (image)

5 Information on road traffic information

  • NEXCO EAST Website "Construction regulation information"Providing information on construction restrictions in each region)
  • NEXCO EAST Road Traffic Information Site "Doratara" (Provide highway traffic information nationwide)
    【PC】External link: Another window display
    【Mobile】 http://m.drivetraffic.jp/
  • Highway telephone
    We provide 24 hours a day highway telephone (automatic voice) traffic updates on Expressway updated every 5 minutes.
    Sendai Station 022-711-1620
    (Mobile phone · PHS speed dial # 8162)
    * It is connected to the nearest information center from anywhere in the country.
  • NEXCO EAST Customer Center (24 hour operator will correspond.)
    0570-024-024 or 03-5338-7524
  • Road traffic information of Japan Road Traffic Information Center (JARTIC)
    050-3369-6761 (Tohoku region · High speed information)
    the internet External link: Another window display
    * It is connected to the nearest information center from anywhere in the country.
* Twitter's official account "NEXCO EAST (Tohoku)" (@ e_nexco_tohokuExternal link: Another window displayHowever, information is delivered.
Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)External link: Another window display してご利用ください。