East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • Japanese
  • English
  • 简体 中文
  • 繁體 中文
  • ภาษา ไทย

【E7】 Akita Expressway(Between Kashiwaoka Moridake IC and Noshiro Minami IC)
Conduct of the night pass

E7Akita Expressway(Between Kashiwaoka Moridake IC and Noshiro Minami IC)
Conduct of the night pass

The latest regulation information,DraTraExternal link: Another window displayPlease see.

2019 July 26
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST Akita Management Office (Akita City, Akita Prefecture) has two lane sections (one lane on one side)E7Akita Expressway At Shigaoka Moritake Interchange (IC) and Noshiro Minami IC, we will carry out the following night-time closing due to pavement repair work etc.

Although it is very troublesome for customers, it is necessary work to use the Expressway safely and comfortably, so we ask for your understanding and cooperation.

1 Closing stop section

【1】 Akita Expressway Between Kashiwaoka Moridake IC and Noshiro South IC (upper and lower lines)
【2】 Akita Expressway Between Hachiryu IC and Noshiro Minami IC (up and down line)

2 Closing Closing Period

[1] Between Shigaoka Moridake IC and Noshiro Minami IC (upper and lower lines)

2019 August 20 (Tuesday)-23 (Fri) (4 days)
2019 September 5 (Thu)-13 (Fri) (6 days)

[2] Between Hachiryu IC and Noshiro South IC (upper and lower lines)

2019 August 26 (Mon)-2019 September 4 (Wed) (8 days)
※ Every night from 20:00 to 6:00

[1] [2] reserve day September 17 (Mon) to 27 (Fri) ※ Saturday, Sunday and holidays are excluded

Closing period

3 Detour

National highway No. 7 / prefectural highway No. 37 [Annex 1】【PDF:193KB】Link to PDF

4 Construction contents

Pavement repair work

  • Damage status
  • Work implementation status

In addition, we carry out bridge inspection, sign inspection, maintenance work.

5 Information provision

We will make a rainy schedule, but if there is a fear of heavy rain and strong wind we will postpone.
Conduct judgment of night pass is performed by the evening on the day of conduct 16:00.

Information on road traffic information
  • The site full of convenient information on Expressway nationwide " DraPla "
    【address】
    PC versionExternal link: Another window display
    モバイル版 (http://m.driveplaza.com/)
    スマートフォン版 (http://www.driveplaza.com/smp/)
  • Traffic information provision service of Expressway "Drive traffic ( DraTra )"

    NEXCO EAST Website "Construction regulation information"Providing information on construction restrictions in each region)
    Aomori Prefecture, Akita Prefecture, Iwate Prefecture "Northeast North", Miyagi Prefecture, Yamagata Prefecture, Fukushima Prefecture "Near Tohoku" please.

    We provide real-time road traffic information and traffic jam prediction.
    【address】
    PC versionExternal link: Another window display
    モバイル版 (http://m.drivetraffic.jp/)
    スマートフォン版 (http://www.drivetraffic.jp/smp/)
  • NEXCO EAST Customer Center
    An operator will be available 24/7.
    【phone number】
    0570-024-024 or 03-5338-7524
  • Highway telephone
    Real-time traffic information (5 minutes update) can be obtained by telephone 24 hours a day.
    【phone number】
    秋田局 018-826-1620  
    From the mobile phone · PHS "# 8162"
    Japan Highway Traffic Information Center
    050-3369-6605 (Akita information)
    050-3369-6761 (Tohoku region high speed information)
  • Highway Radio

    Highway radio (AM 1620 kHz)
    The section that is broadcasting Expressway We will guide you by the sign above.
    We announce wide area road information in an easy-to-understand manner through monitor screen etc. installed in SA / PA.

* Twitter's official account "NEXCO EAST (Tohoku)" (@ e_nexco_tohokuExternal link: Another window displayHowever, information is delivered.
Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)External link: Another window display してご利用ください。