East Nippon Expressway Co., Ltd. Corporate Site

NEXCO EAST

DraPla

language

  • Japanese
  • English
  • 简体 中文
  • 繁體 中文
  • ภาษา ไทย

[E6]Joban Expressway Route 49 (Hira Bypass) accompanying the construction of the city
Iwaki Chuo IC Intersection-Mukaimachida Intersection
Implementation of night-time traffic closure

E6Joban Expressway Route 49 (Hira Bypass) accompanying the construction of the city
Iwaki Chuo IC Intersection-Mukaimachida Intersection
Implementation of night-time traffic closure

~ We will do the bridge construction work ~

~ We will do the bridge construction work ~

2019 August 5
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki Construction Office

NEXCO EAST At the Iwaki Construction Office (Iwaki City, Fukushima Prefecture)E6Joban Expressway With the four-lane construction between Iwaki Central Interchange (IC) and Hirono IC,E6Joban Expressway Due to the construction work of the bridge at the position where National Highway 49 (Platform Bypass) intersects, nighttime traffic closure will be carried out in some sections of National Highway 49 (Platform Bypass). Although traffic congestion due to this closure is not expected, please check the road information before going out.

People who live along the road and those who use National Route 49 (Hira Bypass) will be very inconvenienced. Thank you for your collaboration.

1 Closing stop section

National Route 49 (Hira Bypass) Iwaki Chuo IC Intersection-Mukamachida Intersection
Extension: about 300m
Address: Iwaki City, Fukushima Prefecture
Location diagram: Refer to the diagram below. (Detail is【Attachment 1] [PDF: 136KB]Link to PDFPlease refer to)

Closing section
Institute of Geography (GSI) (https://maps.gsi.go.jp/External link: Another window display), Based on East Japan Expressway Co., Ltd.

2 Dead day and time

Target date 2019 August 26 (Mon), 28 (Wed), 29 (Thu)
Preparation day 2019 September 2 (Mon)-12 (Thu)
Time Every day from 21:00 to the next 6:00

Construction period calendar (August, September)

Construction period calendar (August, September)
  • In the case of stormy we will postpone the construction.
  • The decision to close will be made at 17:00 on the evening of the day.

3 Detour

City Road Kitamachida / Matsuzaka Line, City Road Onigoshi / Hanawa Line, City Road Midai Kagamicho / Kitayoshima Line
Detail is【Attachment 1] [PDF: 136KB]Link to PDFPlease refer to.

4 Construction contents

Joban Expressway Along with the four-lane construction between Iwaki Chuo IC and Hirono IC, the construction of Iwaki Chuo Bridge will be carried out at the position where Joban Expressway and National Route 49 intersect. In order to ensure the safety of people using National Route 49, traffic will be closed. Detail is【Attachment 2] [PDF: 98KB]Link to PDFPlease refer to.

5 Information provision

  • NEXCO EAST Customer Center
    0570-024-024 or 03-5338-7524
  • Road traffic information of Japan Road Traffic Information Center (JARTIC)
    National common dial 050-3369-6666 (mobile phone speed dial # 8011)
    050 - 3369 - 6607 (Fukushima information)
    the internetExternal link: Another window display
  • Road information board (national highway)
  • VICS (Available with VICS compatible car navigation etc.)

6 Efforts to minimize inconveniences to customers caused by construction

[Strengthen information provision]

In addition to the national road information board (electronic bulletin board), flyers will be prepared at the roadside station near the Hira Bypass and will be announced in advance.

Poster / flyer image
"Poster / flyer image"
Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)External link: Another window display してご利用ください。