East Nippon Expressway Co., Ltd. Corporate Site

Construction regulation information

This table lists construction restrictions that are expected to cause customers inconvenience among construction regulation information in Kita Kanto, Koshin (Ibaraki, Tochigi, Gunma, Nagano Prefecture).

The posted construction regulation information is as follows.
· "Road closed"
· Temporary stop on Expressway "One-way alternating traffic regulation"
· Implementing traffic regulations through day and night "Day and night lane regulation"

Also, the schedule for closing the ETC laneDraPlaExternal link: Another window displayPlease check at.

Please note that urgent construction may be performed without prior notice.Japan Road Traffic Information CenterExternal link: Another window displayCheck the website for updates.

(As of March 27, 2020)
Date Time Road name Vertical line section Regulations Construction details Details
2020
March 30 (Mon)
Night at night
~
Until 6 am the next morning
E51
Higashi Kanto
Vertical line Ibaraki Airport North IC
~
Ibaraki Town JCT
Nightly closure Signboard replacement work We will carry out signboard replacement work to number the signboard.
For details of the construction details,HerePlease confirm.
[Updated on March 9]
2020
March 30 (Mon)
21:00
~
Until 5 am the next morning
E18
Joshin-Etsu Expressway
Out-bound line Matsuida Myogi IC
~
Saku IC
Nightly closure Rockfall countermeasure work, inspection of equipment in tunnels, 4-lane restoration work Joshinetsu Expressway Out-bound Line From Matsuida Myoyoshi IC to Saku IC, we will implement rock fall countermeasures for removing rocks on the tunnel, inspect equipment inside the tunnel, and restore four lanes.
For details of the construction details,HerePlease confirm.
[Updated on March 27]
2020
March 30 (Mon)
21:00
~
Until 5 am the next morning
E18
Joshin-Etsu Expressway
In-bound line Saku IC
~
Usui Karuizawa IC
Nightly closure Rockfall countermeasure work, inspection of equipment in tunnels, 4-lane restoration work At the Shinshinetsu Expressway In-bound Line Saku IC to Usui Karuizawa IC, we will implement rock fall countermeasures for removing rocks on the tunnel, inspect equipment inside the tunnel, and restore four lanes.
For details of the construction details,HerePlease confirm.
[Updated on March 27]
2020
Monday, April 13
21:00
~
Until 5 am the next morning
E18
Joshin-Etsu Expressway
Out-bound line Matsuida Myogi IC
~
Usui Karuizawa IC
Nightly closure Rock fall countermeasure construction, inspection of equipment in tunnel At the Joshinetsu Expressway Out-bound line From Matsuida Taeyoshi IC to Usui Karuizawa IC, we will implement rock fall countermeasures for removing rocks on the tunnel and inspect equipment inside the tunnel.
For details of the construction details,HerePlease confirm.
[Updated on March 27]
2020
April 5 (Sun)
~
8th (Wed)
21:00
From
Until 5 am the next morning
E17
Kan-Etsu Expressway
Vertical line Honjo Kodama IC
For Honjo Town / Isezaki
Exit lamp
Night closure Pavement repair work Carry out pavement repairs on damaged road surfaces.
For details of the construction details,HerePlease confirm.
[Updated on March 23]
2020
April 6 (Mon)
22 o'clock at night
From
Until 4:00 the next morning
E50
Kita Kanto Road
To the west Tochigi Tsuga JCT
Tohoku Expressway (In-bound line) direction ramp
Night closure Signboard replacement work We will carry out signboard replacement work to number the signboard.
For details of the construction details,HerePlease confirm.
[Updated on March 23]
2020
April 7 (Tue)
22 o'clock at night
From
Until 4:00 the next morning
E50
Kita Kanto Road
To the west Tochigi Tsuga JCT
Tohoku Expressway (Out-bound) direction ramp
Night closure Signboard replacement work We will carry out signboard replacement work to number the signboard.
For details of the construction details,HerePlease confirm.
[Updated on March 23]
2020
April 8 (Wed)
22 o'clock at night
From
Until 4:00 the next morning
E4
Tohoku Expressway
In-bound line Tochigi Tsuga JCT
North Kanto Expressway (Eastbound) ramp
Night closure Signboard replacement work We will carry out signboard replacement work to number the signboard.
For details of the construction details,HerePlease confirm.
[Updated on March 23]
2020
Thursday, April 9
22 o'clock at night
From
Until 4:00 the next morning
E4
Tohoku Expressway
Out-bound line Tochigi Tsuga JCT
North Kanto Expressway (Eastbound) ramp
Night closure Signboard replacement work We will carry out signboard replacement work to number the signboard.
For details of the construction details,HerePlease confirm.
[Updated on March 23]
2019
October 23 (Wednesday)
~
All day E18
Joshin-Etsu Expressway
Vertical line Usui Karuizawa IC
~
Saku IC
Face-to-face traffic Disaster recovery work In Saku IC from Joshinetsu road Usui Karuizawa IC, for the time being because of the disaster restoration work is In-bound will be face-to-face way that you take advantage of the line (up and down each one lane).
For details,HerePlease confirm.