South Kanto district | Construction regulations and road traffic information |Expressway Information | NEXCO East Japan

East Nippon Expressway Co., Ltd. Corporate Site

Construction regulation information

This table lists construction regulations that are expected to inconvenience customers to customers of construction regulation information in south Kanto (Tokyo, Chiba, Saitama, Kanagawa).

The construction regulation information that is posted is as follows.
· "Road Closed"
· Temporary stop on Expressway "One-sided alternate traffic regulation"
· Implementing traffic regulations through day and night "Day and night continuous lane regulation"

Also, the schedule for closing the ETC laneDraPlaExternal link: Another window displayPlease confirm with.

Please note that constructions requiring emergency may be carried out without prior notice, so before going out,Japan Road Traffic Information CenterExternal link: Another window displayPlease confirm the latest situation on the website of.

Legend

  1. Date
  2. Time
  3. Road name
  4. direction
  5. section
  6. Regulatory content
  7. Construction contents
  8. Details
(令和元年6月17日現在)
Date Time Road name Vertical line section Regulatory content Construction contents Details
2019 June 17 (Mon)
~
2019 June 21 (Fri)
Each day
From 21 o'clock
Until 5 am the next morning
E14
Tateyama road
E14
Futtsu-Tateyama Road
Vertical line Futtsu Central IC
~
Tomiura IC
Nightly closure 4 lane construction work, maintenance repair work We will carry out construction and inspections for the maintenance of the four-laneing project and continuous tunnels and bridges.
For details of the construction details,HerePlease confirm.
[June 3 update]
2019 June 24 (Mon)
~
2019 July 2 (Tuesday)
Each day
From 21 o'clock
Until 5 am the next morning
E14
Tateyama road
E14
Futtsu-Tateyama Road
Vertical line Futtsu Central IC
~
Futtsu Takeoka IC
Nightly closure 4 lane construction work, maintenance repair work We will carry out construction and inspections for the maintenance of the four-laneing project and continuous tunnels and bridges.
For details of the construction details,HerePlease confirm.
[June 3 update]
February 25 (Mon), 2019
~
Summer of 2019
【1】 All day
【2】 Night at night
6:00
E14
Keiyo Road
going up Kaizuka IC
~
Chiba East JCT
[1] Regulation of shoulder locking
【2】 Traveling lane regulation
Congestion protection work Keiyo Road In-bound Line Kaizuka Interchange ~ Chiba East Junction, there is a chronic congestion around the morning and evening commuting time zone, and we are currently working on measures to alleviate the congestion.
Along with this construction, in addition to fixing the temporary restraint (installation of a temporary protective fence) to the shoulder and the median strip, we will implement the lane regulation as necessary.
In addition, although traffic control work will be performed on the In-bound line, traffic restrictions may be implemented on the Out-bound line.
The latest regulatory situation,DraTraExternal link: Another window displayPlease refer to the.
For details of the construction details,HerePlease confirm.
【Updated February 20】
Summer of 2019
~
Spring of 2020
【1】 All day
【2】 Night at night
6:00
E14
Keiyo Road
going up Kaizuka IC
~
Chiba East JCT
【1】 Fixed median strip
【2】 Traveling lane regulation
Congestion protection work Keiyo Road In-bound Line Kaizuka Interchange ~ Chiba East Junction, there is a chronic congestion around the morning and evening commuting time zone, and we are currently working on measures to alleviate the congestion.
Along with this construction, in addition to fixing the temporary restraint (installation of a temporary protective fence) to the shoulder and the median strip, we will implement the lane regulation as necessary.
In addition, although traffic control work will be performed on the In-bound line, traffic restrictions may be implemented on the Out-bound line.
The latest regulatory situation,DraTraExternal link: Another window displayPlease refer to the.
For details of the construction details,HerePlease confirm.
【Updated February 20】
Summer of 2019
~
Autumn of 2019
【1】 All day
【2】 Night at night
6:00
E82
Chiba-Togane Road
going up Chiba East JCT
~
Chiba East IC
[1] Regulation of shoulder locking
【2】 Traveling lane regulation
Congestion protection work Chiba-Togane Road In-bound Line At Chiba East JCT-Chiba East IC, chronic congestion occurs around the morning and evening commuting time zone, and we are currently working on measures to alleviate the traffic jam.
Along with this construction, in addition to fixing the temporary restraint (installation of a temporary protective fence) to the shoulder and the median strip, we will implement the lane regulation as necessary.
In addition, although traffic control work will be performed on the In-bound line, traffic restrictions may be implemented on the Out-bound line.
The latest regulatory situation,DraTraExternal link: Another window displayPlease refer to the.
For details of the construction details,HerePlease confirm.
【Updated February 20】
Autumn of 2019
~
Spring of 2020
【1】 All day
【2】 Night at night
6:00
E82
Chiba-Togane Road
going up Chiba East JCT
~
Chiba East IC
【1】 Fixed median strip
【2】 Traveling lane regulation
Congestion protection work Chiba-Togane Road In-bound Line At Chiba East JCT-Chiba East IC, chronic congestion occurs around the morning and evening commuting time zone, and we are currently working on measures to alleviate the traffic jam.
Along with this construction, in addition to fixing the temporary restraint (installation of a temporary protective fence) to the shoulder and the median strip, we will implement the lane regulation as necessary.
In addition, although traffic control work will be performed on the In-bound line, traffic restrictions may be implemented on the Out-bound line.
The latest regulatory situation,DraTraExternal link: Another window displayPlease refer to the.
For details of the construction details,HerePlease confirm.
【Updated February 20】