East Nippon Expressway Co., Ltd. Corporate Site

Construction regulation information

This table lists construction regulations that are expected to inconvenience customers to customers of construction regulation information in south Kanto (Tokyo, Chiba, Saitama, Kanagawa).

The construction regulation information that is posted is as follows.
· "Road Closed"
· Temporary stop on Expressway "One-sided alternate traffic regulation"
· Implementing traffic regulations through day and night "Day and night continuous lane regulation"

Also, the schedule for closing the ETC laneDraPlaExternal link: Another window displayPlease confirm with.

Please note that constructions requiring emergency may be carried out without prior notice, so before going out,Japan Road Traffic Information CenterExternal link: Another window displayPlease confirm the latest situation on the website of.

Legend

  1. Date
  2. Time
  3. Road name
  4. direction
  5. section
  6. Regulatory content
  7. Construction contents
  8. Details
(2019 December 9, 2009)
Date Time Road name Vertical line section Regulatory content Construction contents Details
2019
Monday, December 16
At night
~
Until 5 am the next morning
C3
Gaikan Expressway
Kawaguchi JCT
(Gaikan Expressway ⇒
Tohoku Expressway Out-bound line and
Metropolitan Expressway Kawaguchi Line)
Night closure Label replacement work In each IC / JCT on the outer ring road, signboard replacement work will be performed to number the signboard.
It is necessary to close the lamp before starting the construction because the construction is not possible under normal lane regulations.
For details of the construction details,HerePlease confirm.
[Updated on November 1]
2019
Monday, December 9
At night
~
Until 3 am the next morning
E83
Yokohama-Shindo Road
In-bound line New Hodogaya IC
(Yokohama-Shindo Road In-bound Line ⇒
Metropolitan Expressway Kariba Line and Hodogaya Bypass)
Night closure Signboard replacement work We will carry out signboard replacement work to number the signboard.
For details of the construction details,HerePlease confirm.
[November 25 update]
2019
Monday, December 9
At night
~
Until 6 am the next morning
C4
Ken-O Road
Inside and outside Yodogawa Kano IC Exit Lamp
(Ken-O Road Ou Expressway-> General Road (for Yodogawa / Ageo))
Night closure Pavement and bridge repair work We will repair and inspect damaged road pavements and bridge joints.
For details of the construction details,HerePlease confirm.
[November 25 update]
2019
December 10 (Tue)
At night
~
Until 3 am the next morning
E83
Third Keihin
E83
Yokohama-Shindo Road
Hodogaya IC
(Kanagawa Prefectural Road 13 Yokohama Ikuta Line⇒
Entrance lamp)
Night closure Signboard replacement work We will carry out signboard replacement work to number the signboard.
For details of the construction details,HerePlease confirm.
[November 25 update]
2019
December 10 (Tue)
At night
~
Until 6 am the next morning
C4
Ken-O Road
E4
Tohoku Expressway
Kuki Shiraoka JCT
(Tohoku Expressway upper and lower line ⇒ Ken-O Road Uchimawari)
Night closure Pavement and bridge repair work We will repair and inspect damaged road pavements and bridge joints.
For details of the construction details,HerePlease confirm.
[November 25 update]
2019
Monday, December 16
Night at night
~
Until 5 am the next morning
E14
Keiyo Road
Out-bound line Baraki IC exit lamp Night closure Pavement repair work Carry out pavement repairs on damaged road surfaces.
For details of the construction details,HerePlease confirm.
[December 2 update]
2019
December 18 (Wednesday)
At night
~
Until 6 am the next morning
E4
Tohoku Expressway
Vertical line Kazo IC
(Tohoku Expressway Expressway ⇒ General road (to Kazo))
Night closure Pavement and bridge repair work We will repair and inspect damaged road pavements and bridge joints.
For details of the construction details,HerePlease confirm.
[November 25 update]
2019
December 19 (Thursday)
At night
~
Until 6 am the next morning
E4
Tohoku Expressway
Vertical line Kazo IC
(General road (in the direction of Kurihashi) ⇒ Tohoku Expressway line)
Night closure Pavement and bridge repair work We will repair and inspect damaged road pavements and bridge joints.
For details of the construction details,HerePlease confirm.
[November 25 update]
2019
December 20 (Friday)
At night
~
Until 6 am the next morning
E4
Tohoku Expressway
Out-bound line Iwatsuki IC
(General road ⇒ Tohoku Expressway Out-bound line)
Night closure Pavement and bridge repair work We will repair and inspect damaged road pavements and bridge joints.
For details of the construction details,HerePlease confirm.
[November 25 update]
2018
June 5 (Tue)
~
Spring of 2020
【1】 All day
[2] 20:00
~
6:00
E14
Keiyo Road
Vertical line Funabashi IC
~
Takeishi IC
【1】 Fixed median strip
[2] Driving or overtaking lane regulations
Congestion protection work
(Construction on the median strip side)
Keiyo Road Line Funabashi Interchange-Takeishi Interchange has chronic traffic jams, especially in the morning and evening commuting hours, and we are currently working on countermeasures (installation of additional lanes) to alleviate traffic jams. .
Along with this construction, in addition to installing fixed restrictions (installation of temporary protective fences) in the median strip, we will implement roadside restrictions and lane restrictions as necessary.

The latest regulatory situation,DraTraExternal link: Another window display
For details of the construction details,Here【PDF: 479KB】Link to PDFPlease confirm.
【Updated September 25】
Autumn of 2019
~
2020 summer
[1] 8am
~
18:00
[2] 20:00
~
6:00
E14
Keiyo Road
Vertical line Funabashi IC
~
Takeishi IC
[1] Road shoulder regulation
[2] Driving or overtaking lane regulations
Congestion protection work
(Installation of additional lanes to be constructed on the shoulder side)
Keiyo Road Line Funabashi Interchange-Takeishi Interchange has chronic traffic jams, especially in the morning and evening commuting hours, and we are currently working on countermeasures (installation of additional lanes) to alleviate traffic jams. .
Along with this construction, in addition to installing fixed restrictions (installation of temporary protective fences) in the median strip, we will implement roadside restrictions and lane restrictions as necessary.

The latest regulatory situation,DraTraExternal link: Another window display
For details of the construction details,Here【PDF: 479KB】Link to PDFPlease confirm.
【Updated September 25】
Autumn of 2019
~
Spring of 2020
【1】 All day
【2】 Night at night
6:00
E14
Keiyo Road
going up Kaizuka IC
~
Chiba East JCT
【1】 Fixed median strip
【2】 Traveling lane regulation
Congestion protection work Keiyo Road In-bound Line Kaizuka Interchange ~ Chiba East Junction, there is a chronic congestion around the morning and evening commuting time zone, and we are currently working on measures to alleviate the congestion.
Along with this construction, in addition to fixing the temporary restraint (installation of a temporary protective fence) to the shoulder and the median strip, we will implement the lane regulation as necessary.
In addition, although traffic control work will be performed on the In-bound line, traffic restrictions may be implemented on the Out-bound line.
The latest regulatory situation,DraTraExternal link: Another window display
For details of the construction details,HerePlease confirm.
【Updated February 20】
Summer of 2019
~
2019 Winter
【1】 All day
【2】 Night at night
6:00
E82
Chiba-Togane Road
going up Chiba East JCT
~
Chiba East IC
[1] Regulation of shoulder locking
【2】 Traveling lane regulation
Congestion protection work Chiba-Togane Road In-bound Line At Chiba East JCT-Chiba East IC, chronic congestion occurs around the morning and evening commuting time zone, and we are currently working on measures to alleviate the traffic jam.
Along with this construction, in addition to fixing the temporary restraint (installation of a temporary protective fence) to the shoulder and the median strip, we will implement the lane regulation as necessary.
In addition, although traffic control work will be performed on the In-bound line, traffic restrictions may be implemented on the Out-bound line.
The latest regulatory situation,DraTraExternal link: Another window display
For details of the construction details,HerePlease confirm.
【Updated February 20】
2019 Winter
~
Spring of 2020
【1】 All day
【2】 Night at night
6:00
E82
Chiba-Togane Road
going up Chiba East JCT
~
Chiba East IC
【1】 Fixed median strip
【2】 Traveling lane regulation
Congestion protection work Chiba-Togane Road In-bound Line At Chiba East JCT-Chiba East IC, chronic congestion occurs around the morning and evening commuting time zone, and we are currently working on measures to alleviate the traffic jam.
Along with this construction, in addition to fixing the temporary restraint (installation of a temporary protective fence) to the shoulder and the median strip, we will implement the lane regulation as necessary.
In addition, although traffic control work will be performed on the In-bound line, traffic restrictions may be implemented on the Out-bound line.
The latest regulatory situation,DraTraExternal link: Another window display
For details of the construction details,HerePlease confirm.
【Updated February 20】
Download Adobe Reader
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not haveDownload from here (free)Please use it.