East Nippon Expressway Co., Ltd. Corporate Site

Construction regulation information

This table lists construction restrictions that are expected to cause customers inconvenience among construction regulation information in south northeast (Miyagi prefecture, Yamagata prefecture, Fukushima prefecture).

The construction regulation information that is posted is as follows.
· "Road Closed"
· Temporary stop on Expressway "One-sided alternate traffic regulation"
· Implementing traffic regulations through day and night "Day and night continuous lane regulation"

Also, the schedule for closing the ETC laneDraPlaExternal link: Another window displayPlease confirm with.

Please note that constructions requiring emergency may be carried out without prior notice, so before going out,Japan Road Traffic Information CenterExternal link: Another window displayPlease confirm the latest situation on the website of.

(令和元年10月16日現在)

Date Time Road name Vertical line section Regulatory content Construction contents Details
Oct. 16
~
Nov. 1
毎夜 20:00
~
翌朝 5:00
Joban Expressway Vertical line Iwaki Central IC
~
Hirono IC
Nightly closure Pave repair work etc. For more informationHere
* 1 [Preliminary date] November 5 (Tue)-8 (Fri), November 11 (Mon)-15 (Fri)
※ We do not regulate in principle on 2 saturday, sunday, and public holidays, but as we may change the closing time and section depending on the weather, Expressway When using "DraTraExternal link: Another window displayPlease check the latest information on websites such as
Oct. 31 20: 00
~
翌朝 5:00
Joban Expressway Vertical line Joban Tomioka IC
~
Minami Soma
Nightly closure Pave repair work etc. For more informationHere
* 1 [Preliminary Day] November 1 (Friday), 5 (Tuesday) to 8 (Friday), 11 (Monday) to 15 (Friday)
※ We do not regulate in principle on 2 saturday, sunday, and public holidays, but as we may change the closing time and section depending on the weather, Expressway When using "DraTraExternal link: Another window displayPlease check the latest information on websites such as
Oct. 9
~
October 21
毎夜 20:00
~
翌朝 6:00
Ban-Etsu Expressway Vertical line Nishi Azu IC
~
Aizusaka-shima IC
Nightly closure Pave repair work etc. For more informationHere
* 1 [Preliminary date] October 23-25 (Friday)
* 2 Excluding Saturdays, Sundays and public holidays
* 3 Nishiaizu PA (Out-bound Line) closes at 20:00. Nishiaizu PA (In-bound Line) from the main line (to Fukushima) will close at 20:00.
* 4 The work may be postponed or canceled if the weather deteriorates or worsens.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Oct. 28
~
Nov. 1
毎夜 20:00
~
翌朝 6:00
Ban-Etsu Expressway Vertical line Aizusaka-shima IC
~
Aizuwakamatsu IC
Nightly closure Pave repair work etc. For more informationHere
* 1 [Preliminary day] November 5 (Tue)-8 (Fri)
* 2 Shinzuru PA will be closed at 20:00 on both the upper and lower lines.
* 3 The work may be postponed or canceled if the weather deteriorates or worsens.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Aug. 26
~
Oct. 19
毎夜 21:00
~
翌朝 6:00
Nihonkai-Tohoku Expressway Vertical line Tsuruoka Nishi IC
~
Tsuruoka JCT
Nightly closure Median strip installation work, etc. For more informationHere
* 1 Excluding Saturdays, Sundays and public holidays
* 2 The regulation time will be shortened on Friday nights (22:00-5:00 the next day)
September 24
~
Oct. 25
毎夜 20:00
~
翌朝 6:00
Yamagata Expressway Vertical line Shouchi Asahi IC
~
Tsuruoka IC
Nightly closure Pave repair work etc. For more informationHere
* 1 [Preliminary date] October 28 (Mon)-November 8 (Fri)
* 2 As a general rule, no construction is performed on Saturdays, Sundays and public holidays.
* 3 The regulation period is subject to change depending on the weather, etc.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Oct. 15
~
Oct. 23
毎夜 21:00
~
翌朝 6:00
Tohoku Expressway Out-bound line Koriyama IC
(Out-bound line exit ramp)
Night closure Telescopic device replacement work For more informationHere
* 1 [Preliminary day] October 24 (Thu)-31 (Thu)
* 2 Excluding Friday, Saturday, Sunday and public holidays
* 3 The work may be postponed or canceled if the weather deteriorates or worsens.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Oct. 15
~
October 24
毎夜 21:00
~
毎朝 6:00
Sendai-Hokubu Road Vertical line Rifu JCT
~
Tomiya IC
Nightly closure Road surface repair work, etc. For more informationHere
* 1 [Preliminary date] October 25 (Friday)-November 1 (Friday)
* 2 Construction will not be performed on Monday, October 21, excluding Saturdays, Sundays and public holidays.
* 3 The work may be postponed or canceled if the weather deteriorates or worsens.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Nov. 5
~
Nov. 12
毎夜 21:00
~
毎朝 6:00
Sendai-Hokubu Road Vertical line Rifu JCT
~
Tomiya IC
Nightly closure Road surface repair work, etc. For more informationHere
* 1 [Preliminary date] November 13 (Wed)-22 (Fri)
* 2 Excluding Saturdays, Sundays and public holidays
* 3 The work may be postponed or canceled if the weather deteriorates or worsens.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Nov. 12 22: 00
~ 翌朝 5:00
Ban-Etsu Expressway Vertical line Bandai Atami IC
~
Inawashiro Bandai Highland IC
Nightly closure Information board update work For more informationHere
* 1 [Preliminary day] November 13 (Wed), 14 (Thu)
* 2 Work may be postponed or canceled if the weather deteriorates or worsens.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Nov. 19 22: 00
~ 翌朝 5:00
Tohoku Expressway Vertical line Sukagawa IC
~
Inawashiro Bandai Highland IC
Nightly closure Information board update work For more informationHere
* 1 [Preliminary date] November 20 (Wed), 21 (Thu)
* 2 Work may be postponed or canceled if the weather deteriorates or worsens.DraTraExternal link: Another window displayPlease check the latest information through websites such as
Jan. 8
~
規制開始日 7:30
~
Tohoku Expressway Vertical line Kunimi SA usage limit Pavement marker
Temporary works
The latest regulatory situation,DraTraExternal link: Another window display
For details of the construction details,HerePlease confirm.
* 1 Details of construction [2]Attachment Figures 1-1, 1-2【PDF: 1.2MB】Link to PDF
※ 2 Continue to use vending machines and toilets (including multifunction toilets), gas stations and EV quick charging stations on the shopping corner, food court, take-out shop side. (Vertical line)
* 3 For SA / PA that can be used in the neighborhoodAttached Figure 2【PDF: 193KB】Link to PDF
※ 4 Large size / small size combination indicates the number of cars that can be parked as a large car.
* 5 Please go through the SA as instructed by the leader.
April 1st
~
Dec. 20
規制開始日 5:00
~
規制撤去日 18:00
Yamagata Expressway In-bound line Sekizawa IC

Sasaya IC
Day and night continuous lane regulation Tunnel reinforcement work The latest regulatory situation,DraTraExternal link: Another window display
For details of the construction details,HerePlease confirm.
※ As a rule, we do not regulate on weekends and holidays.
※ Deregulation time may be changed when work is completed early.
※ If the weather is worse or there is a risk of deterioration, we will stop working.
Aug. 19
~
Oct. 16
規制開始日 9:00
~
規制撤去日 18:00
Yamagata Expressway Vertical line Yutetsuyama IC Restriction on use (entrance) ETC facility renewal work * During the period, the ETC wide lane of Yudonosan IC (entrance) will be closed. As a result, special vehicles from the Yudonoyama IC (wide vehicles with a width of over 3.0m) are requested to cooperate with the inflow from the general lane.
Aug. 19
~
Oct. 16
規制開始日 9:00
~
規制撤去日 18:00
Yamagata Expressway Vertical line Yutetsuyama IC Usage restriction (exit) ETC facility renewal work * During the period, the ETC wide lane of Yudonosan IC (exit) will be closed. As a result, special vehicles (wide vehicles with a width of over 3.0m) cannot be discharged from Yudonoyama IC. If you are planning to use a special vehicle (a vehicle with a width of more than 3.0m), please use the Shonai Asahi IC.
Sep. 2
~
Mar. 13
規制開始日 6:00
~
規制撤去日 17:00
Tohoku Expressway Out-bound line Chojabaru SA usage limit Pavement work etc. * 1 Regulations will be conducted day and night on Saturdays, Sundays and public holidays.
* 2 The construction period may change depending on the weather and working conditions.
* 3 Shopping corners, takeouts, vending machines, toilets (including multifunctional toilets), gas stations, and smart interchanges can still be used.
* 4 There are days when the quick charger cannot be used.HPExternal link: Another window displayPlease verify.
Sep. 30
~
October 18
規制開始日 9:00
~
規制撤去日 16:00
Yamagata Expressway Vertical line Yamagata JCT
~
Sagae IC
One-sided alternate traffic regulation Pavement repair work ※ 1 If there is a risk of deterioration or deterioration of the weather, work may be discontinued.
※ We may change work day by progress of construction cancellation with construction that 2 aggravation worsens.
※ 3 As a rule, we do not regulate on Saturdays, Sundays and holidays.
* 4 If the work is completed early, the regulation will be cancelled.
Oct. 15
~
October 18
規制開始日 6:00
~
規制撤去日 18:00
Tohoku Expressway In-bound line Shiraishi IC

Kunimi IC
Day and night continuous lane regulation Pavement repair work ※ 1 If there is a risk of deterioration or deterioration of the weather, work may be discontinued.
※ We may change work day by progress of construction cancellation with construction that 2 aggravation worsens.
※ 3 As a rule, we do not regulate on Saturdays, Sundays and holidays.
* 4 If the work is completed early, the regulation will be cancelled.
Oct. 23
~
Oct. 25
規制開始日 6:00
~
規制撤去日 18:00
Tohoku Expressway In-bound line Shiraishi IC

Kunimi IC
Day and night continuous lane regulation Pavement repair work ※ 1 If there is a risk of deterioration or deterioration of the weather, work may be discontinued.
※ We may change work day by progress of construction cancellation with construction that 2 aggravation worsens.
※ 3 As a rule, we do not regulate on Saturdays, Sundays and holidays.
* 4 If the work is completed early, the regulation will be cancelled.
Oct. 15
~
October 18
規制開始日 6:00
~
規制撤去日 18:00
Tohoku Expressway In-bound line Koriyama JCT

Koriyama Chuo SIC
Day and night continuous lane regulation Pavement repair work ※ 1 If there is a risk of deterioration or deterioration of the weather, work may be discontinued.
※ We may change work day by progress of construction cancellation with construction that 2 aggravation worsens.
※ 3 As a rule, we do not regulate on Saturdays, Sundays and holidays.
* 4 If the work is completed early, the regulation will be cancelled.
Oct. 23 規制開始日 20:00
~
規制撤去日 6:00
Sendai-Tobu Road Vertical line 名取IC Usage restriction (exit) Pavement repair work ※期間中、名取IC(出口)の幅広レーンを閉鎖いたします。これにより、名取ICからの特殊車両(車幅2.5m超の幅広車)の流出が制限されます。天候が悪化、もしくは悪化の恐れがある場合は、作業を延期または中止する場合があります。ご迷惑をお掛けしますが、ご利用を予定されている場合、近隣のインターチェンジへの迂回にご協力お願いいたします。
Oct. 25 規制開始日 20:00
~
規制撤去日 6:00
Sendai-Tobu Road Vertical line 名取IC Restriction on use (entrance) Pavement repair work ※期間中、名取IC(入口)の幅広レーンを閉鎖いたします。これにより、名取ICからの特殊車両(車幅2.5m超の幅広車)の流入が制限されます。天候が悪化、もしくは悪化の恐れがある場合は、作業を延期または中止する場合があります。ご迷惑をお掛けしますが、ご利用を予定されている場合、近隣のインターチェンジへの迂回にご協力お願いいたします。
Download Adobe Reader