RENEWAL
To pass on safety and security to the next generation
For a long time
Bridges, tunnels, etc.
Large-scale renewal work
We are carrying out.
Understanding and cooperation for construction
Thank you.
Regulations
Face-to-face traffic regulation
Construction will be carried out while securing 2 lanes (1 lane on each side) out of 4 round-trip lanes (2 lanes on each side).
- We will implement construction methods that can reduce the impact on traffic as much as possible, such as face-to-face traffic restrictions that ensure traffic in both directions without closing traffic.
section
E4 Tohoku Expressway
Tsukidate IC-Ichinoseki IC (upper and lower lines)
period
Monday, May 16, 2022
~ Friday, July 15, 2022
- All-day lane regulation (14 days)
- All-day face-to-face traffic regulation (47 days)
- All day restrictions will be applied on Saturdays, Sundays and public holidays.
- The construction period may change depending on the weather and work progress.
Construction details
By replacing the deteriorated existing concrete deck * with a new deck, it will be reborn as a Expressway that can be used safely and comfortably.
- A deck is a structural member that directly supports automobiles passing through bridges and transmits the load to the girder.
Precautions when using
We are predicting traffic congestion, so
Please go out with plenty of time.
The maximum speed is limited to 50km / h in the restricted section.
Please obtain traffic information in advance and go out with plenty of time.
Please note that the lane width and shoulder width may be narrowed.
If a traffic jam occurs, please turn on the hazard lamp at the end and signal the following vehicle to help prevent a rear-end collision.
Vehicles for construction work may enter and leave the area around the construction site, so please be careful when traveling ahead.
During the construction period, we will provide construction regulation information using road information boards, road signs, and simple information boards, and call attention to drive safely. Before riding, please check the above information before riding safely.
Image of information provision image around the construction site
Tohoku Expressway renewal work planned
Contact information
Inquiries about Expressway information
NEXCO EAST Customer Center
0570-024-024
または
03-5308-2424
We listen to our customers 24 hours a day, 365 days a year.
Inquiries about road traffic information
Japan Road Traffic Information Center National Unified Number
050-3369-6666
Mobile speed dial (smartphone / mobile phone) # 8011
全国高速ダイヤル(自動応答専用)050-3369-6700
Road emergency dial# 9910
Please listen to the highway radio (1620kHz) for road traffic information while driving.
Also, please use the SA / PA highway information terminal near you.