[Reference] Recent traffic conditions on the outer ring road
  • * Definition of the number of traffic jams: The number of times when a train that repeats low speed running or stop / start at 20 km / h or less continues for 1 km or more and 15 minutes or more (preliminary value)
    Before opening H29.6.4 (Sun) -H29.9.1 (Fri) After opening H30.6.3 (Sun) -H30.8.31 (Fri)
  • * Because it is a traffic congestion definition in statistical processing, it may differ from the traffic congestion information provision status.
  • ○ With the opening of the outer ring road Misato Minami IC-Takaya JCT, the traffic volume of the existing outer ring road (between Oizumi JCT and Misato Minami IC) is increasing, resulting in increased congestion and congestion.
  • ○ congestion, congestion mainly sag part (Out-bound from the hill In-bound has occurred in the recess approaches the hill), to inform the congestion point, such as the installation of suppressing label signs and speed reduced to encourage speed recovery, the measures implemented doing.
  • ○ We will continue to carry out a detailed analysis of traffic trends to alleviate congestion and congestion on the outer ring road, and will study and implement necessary measures in the future.
If you see these signs, beware of unintentional slowdowns,
Thank you for your cooperation in alleviating traffic congestion.