Section diagram
Section map

Female image

RENEWAL

To pass on safety and security to the next generation
For a long time
Bridges, tunnels, etc.
Large-scale renewal work
We are carrying out.
Understanding and cooperation for construction
Thank you.

Regulations

Two-way traffic regulation (three-lane operation)

Construction will be carried out while securing 3 lanes (2 lanes, 1 lane) out of 4 lanes (2 lanes on one side).

8/24~9/12
Depending on the weather and construction progress, the schedule and time may change.

Lane operation status from around 7:00 p.m. to around 12:00 p.m. the next day
Face-to-face traffic regulation
Lane operation status from around 12:00 p.m. to around 7:00 p.m.
Face-to-face traffic regulation

9/14~10/11
Depending on the weather and construction progress, the schedule and time may change.

Lane operation status from around 7:00 p.m. to around 12:00 p.m. the next day
Face-to-face traffic regulation
Lane operation status from around 12:00 p.m. to around 7:00 p.m.
Face-to-face traffic regulation

section

E5 Hokkaido Expressway  
Ebetsu Higashi IC-Iwamizawa IC (upper and lower lines)

Section map

period

Wednesday, August 24, 2022
~ Wednesday, October 12, 2022

  • All-day face-to-face traffic regulation (3-lane operation)
  • All-day face-to-face traffic regulation (2-lane operation)
  • All day lane regulation
August 2022
September 2022
October 2022
  • All day restrictions will be applied on Saturdays, Sundays and public holidays.
  • The construction period may change depending on the weather and work progress.

Construction details

Planned and large-scale repairs should be carried out on the superstructure (floor slab) of the bridge against deformations caused by the progress of aging, salt damage caused by antifreezing agents and flying salt, and fatigue caused by heavy traffic. This suppresses the progress of deformation and the occurrence of new deformation.

floor slab replacement
  • A deck is a structural member that directly supports automobiles passing through bridges and transmits the load to the girder.

Utilization of load zipper system

In this work, the installation position of the median strip (concrete protective fence) will be switched by moving it using a dedicated vehicle. As a result, the number of lanes will be changed according to the time of day when there are many customers, and traffic congestion due to construction restrictions in the morning and evening will be alleviated.

Utilization of load zipper system

Example of traffic regulation by road zipper system (Example of floor slab replacement work between Do-O Expressway Eniwa IC and Kitahiroshima IC)

Precautions when using

Traffic congestion is expected, so
Please go out with plenty of time.

The maximum speed is limited to 50km / h in the restricted section.

Please obtain traffic information in advance and go out with plenty of time.
Please note that the lane width and shoulder width may be narrowed.

If a traffic jam occurs, please turn on the hazard lamp at the end and signal the following vehicle to help prevent a rear-end collision.

Vehicles for construction work may enter and leave the area around the construction site, so please be careful when traveling ahead.

During the construction period, we will provide construction regulation information using road information boards, road signs, and simple information boards, and call attention to drive safely. Before riding, please check the above information before riding safely.

Image of information provision image around the construction site

LED information board
LED information board
Road information version
Road information version

TV commercial

Poster, leaflet, leaflet

Posters
Leaflet
Flyer

Contact information

Inquiries about Expressway information

  • DraTra Drive Traffic

    For information on real-time traffic conditions and traffic congestion forecasts, see "DraTra"

  • DraPla E-NEXCO Drive Plaza

    Expressway tolls and information on service areas at "DraPla"

NEXCO EAST Customer Center

Navi dial0570-024-024
または
03-5308-2424

We listen to our customers 24 hours a day, 365 days a year.

Inquiries about road traffic information

Japan Road Traffic Information Center National Unified Number

050-3369-6666

Mobile speed dial (smartphone / mobile phone) # 8011

全国高速ダイヤル(自動応答専用)050-3369-6700

Road emergency dial# 9910

Please listen to the highway radio (1620kHz) for road traffic information while driving.

Also, please use the SA / PA highway information terminal near you.