Female image

RENEWAL

To pass on safety and security to the next generation
For a long time
Bridges, tunnels, etc.
Large-scale renewal work
We are carrying out.
Understanding and cooperation for construction
Thank you.

Regulations

Face-to-face traffic regulation

上下4車線(片側2車線)のうち、2車線(片側1車線)を確保しつつ、工事をおこないます。

Face-to-face traffic regulation

section

E5 Hokkaido Expressway  
Ebetsu Higashi IC-Iwamizawa IC (upper and lower lines)

section

period

2022年5月9日(月)
~ 2022年7月15日(金)

  • All-day traffic regulation for two-way traffic
  • All day lane regulation
May 2022
June 2022
July 2022
  • All day restrictions will be applied on Saturdays, Sundays and public holidays.
  • The construction period may change depending on the weather and work progress.

Construction details

Planned and large-scale repairs should be carried out on the superstructure (floor slab) of the bridge against deformations caused by the progress of aging, salt damage caused by antifreezing agents and flying salt, and fatigue caused by heavy traffic. This suppresses the progress of deformation and the occurrence of new deformation.

  • A deck is a structural member that directly supports automobiles passing through bridges and transmits the load to the girder.

Precautions when using

Traffic congestion is expected, so
Please go out with plenty of time.

The maximum speed is limited to 50km / h in the restricted section.

Please obtain traffic information in advance and go out with plenty of time.
Please note that the lane width and shoulder width may be narrowed.

If a traffic jam occurs, please turn on the hazard lamp at the end and signal the following vehicle to help prevent a rear-end collision.

Vehicles for construction work may enter and leave the area around the construction site, so please be careful when traveling ahead.

During the construction period, we will provide construction regulation information using road information boards, road signs, and simple information boards, and call attention to drive safely. Before riding, please check the above information before riding safely.

Image of information provision image around the construction site

LED information board
LED information board
Road information version
Road information version

Contact information

Inquiries about Expressway information

  • DraTra Drive Traffic

    For information on real-time traffic conditions and traffic congestion forecasts, see "DraTra"

  • DraPla E-NEXCO Drive Plaza

    Expressway tolls and information on service areas at "DraPla"

NEXCO EAST Customer Center

Navi dial0570-024-024
または
03-5308-2424

We listen to our customers 24 hours a day, 365 days a year.

Inquiries about road traffic information

Japan Road Traffic Information Center National Unified Number

050-3369-6666

Mobile speed dial (smartphone / mobile phone) # 8011

全国高速ダイヤル(自動応答専用)050-3369-6700

Road emergency dial# 9910

Please listen to the highway radio (1620kHz) for road traffic information while driving.

Also, please use the SA / PA highway information terminal near you.