RECRUIT
know the company
numbers about
e-nexco
number of people in our group
15,876人
Group companies as one
Daily safety that we create.
高速道路はNEXCO東日本だけで管理運営、建設しているわけではありません。業務形態や地域特性を踏まえて編成された31のグループ会社とともに私たちは高速道路を守っています。その人数は、15,876人。グループ会社一体となった協働体制により日々の「安全」は生み出されています。
※2025年3月末時点での数字
including Expressway business and related business
our operating income
8,369億円
Among domestic road companies
Maximum operating income.
私たちの営業収入は、約8,369億円(2024年度)。ここには高速道路の料金収入などからなる「道路事業」での収入に加え、サービスエリアやその他関連事業からなる「収益事業」での収入が含まれます。
※2025年3月時点での数字
we are in control
total Expressway distance
3,943 km
Expressway in japan
accounting for more than 40%,
Japan's largest Expressway company.
Do you know the longest Expressway in Japan? The answer is the Tohoku Expressway. The distance is about 680km. Conversely, the shortest Expressway in Japan is the Shin-Kuko Expressway (Narita City, Chiba Prefecture) at 3.9km. The total distance of the Expressway under our jurisdiction is 3,943 km when these individual routes are connected. This is the length that accounts for more than 40% of Japan's Expressway.
※2025年3月時点での数字
Number of Expressway users per day
302万台
As an economic artery,
Support Japan.
NEXCO東日本が管轄する高速道路は、一日に約302万台ものお客様にご利用いただいています。そのうちの約21%、およそ63万台の自動車が貨物自動車や旅客輸送者などの中型車、大型車、特大車。このことからも、高速道路が日本の物流・人流を支える経済の大動脈であることが分かります。
※2025年3月時点での数字
Distance of Expressway opened after privatization
605 km
in a wider area,
Have a safe, secure and comfortable drive.
Since the Japan Highway Public Corporation was split and privatized in 2005 and NEXCO EAST was established, we have opened 605 kilometers of Expressway. As a result, traffic congestion in the metropolitan area is eased, tourism is supported through a smooth transportation network, and logistics efficiency is improved.
※2025年3月時点での数字
we are building now
Expressway distance
315Km
towards the future
A road that produces economic effects.
私たちはネットワーク整備の推進や首都圏の環状道路の整備を進めています。その距離、315㎞(4車線化事業を含む)。あらゆる場所を結ぶ、より便利な高速道路の建設は、地域間交流の活性化、産業の振興、雇用の創出などの様々な経済効果を生み出すことに繋がります。
※2025年3月時点での数字
From the occurrence of the Great East Japan Earthquake
Time to secure an emergency traffic route
20 hours
To connect the “road of life”.
Restoration work that we worked on together.
The Great East Japan Earthquake also caused major damage to Expressway. A total of about 870km of traffic was damaged. We worked on emergency restoration work day and night, and completed temporary restoration work that enabled emergency vehicles to pass about 20 hours after the earthquake. After 13 days, emergency restoration work was completed to allow general vehicles to pass through.
*Numbers as of January 2022
we create and manage
The longest mountain tunnel in Japan
11,055 m
Changed "Togegoe",
Kanetsu Tunnel.
The Kanetsu Tunnel connecting Niigata Prefecture and Gunma Prefecture is about 11 kilometers long. This is the longest mountain tunnel in Japan. Until then, it took a long time to cross the mountain pass due to snow accumulation and frozen road surfaces in winter, but the opening of the Kanetsu Tunnel greatly shortened the time, and the transportation of goods and people between Niigata and the Kanto region dramatically improved. It grew and contributed to the dawn of the new era of the Sea of Japan.
*Numbers as of January 2022
we create and manage
Japan's longest bridge
4,384 m
Running through Tokyo Bay,
aqua bridge.
The Tokyo Wan Aqua-Line Expressway is a 15.1km long Expressway that traverses the central part of Tokyo Bay and connects Kawasaki City in Kanagawa Prefecture and Kisarazu City in Chiba Prefecture. The Aqua Bridge, which spans Japan's first marine rest facility "Umihotaru" and connects to the Kisarazu side, is the longest bridge in Japan with a total length of 4,384m. With the opening of the Aqua-Line, Kisarazu City's population has increased, tourism demand creation and corporate expansion in the Boso area, and the location of large-scale commercial facilities have progressed dramatically.
*Numbers as of January 2022
our infrastructure
number of visitors
1,587 people
can't usually see
Sneak behind the infrastructure!
This is the number of participants in tours that include visits to infrastructure facilities among recruitment-type planned trips sponsored by our company after our company's registration as a travel agency. It has been well received as a project that guides you to the "back side" of the Tokyo Wan Aqua-Line Expressway and the Kanetsu Tunnel, which is usually not accessible, and the construction site of the Expressway, making you feel more familiar with the Expressway.
* Figures as of the end of July 2022
EV quick charger on Expressway
154 locations
of the next generation
for automobiles.
NEXCO EAST is gradually installing quick chargers for customers who use electric vehicles, and currently has 154 locations. We will continue to consider increasing the number of quick chargers based on trends in the use of quick chargers.
*Numbers as of January 2022
the area we planted
3,700 ha
contribute to the prevention of global warming,
forest formation.
We have planted trees on an area of about 3,700ha by 2020 on the Expressway site. Converting this to Tokyo Dome, it is actually 787 pieces. The absorption and fixation effect of Co2 is estimated to be approximately 39,000 tons. We will continue to contribute to the conservation of the global environment and the formation of a recycling-oriented society, and will promote efforts to conserve the living environment along the road and the natural environment.
*Numbers as of January 2022