[E5A] Notice on road condition and repair work on the Shiribeshi Shiribeshi Expressway (Yoichi IC-Otaru JCT)

2019 February 15
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

 E5AShiribeshi Shiribeshi Mr. motorway (SHIRIBESHI EXPRESSWAY road surface in between) Yoichi Yoichi Interchange (IC) ~ Otaru Otaru junction (JCT), the road surface under the frozen due to the decrease of temperature, seems to be due to the fact that the earth's surface has been lifted There is unevenness in.
We are currently investigating the detailed cause, but we will carry out repair work on the part where the unevenness has occurred.
Until the repair is completed, the maximum speed limit of 50 km / h is enforced.
We apologize for the inconvenience, and thank you for your understanding and cooperation.

1 construction period

2019 February 18th (Mon) -March 8th (Fri)

  • The period may change depending on the weather and work progress.

2 Construction site

E5A SHIRIBESHI EXPRESSWAY Yoichi IC-Otaru JCT (Both directions) Around Otaru Shioya IC

  • It regulates lanes and repairs uneven pavements.
  • You can pass through during the repair work period, but please be careful when passing because lane restrictions are enforced.

3 Information during construction

NEXCO EAST Expressway Traffic Information Site " Drive traffic (DraTra) The latest traffic information is posted in.

Image image of repair work site
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.