Do-O Expressway Asahikawa Takasu IC-Shibetsu Kenbuchi IC Night closure notice

~We will repair the pavement~

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Do-O Expressway Asahikawa Takasu IC-Shibetsu Kenbuchi IC Night closure notice

April 2, 2010
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

NEXCO EAST Hokkaido Regional Head Office (Sapporo Atsubetsu-ku, Regional Head Office length: Hiromi Yamamoto), the Do-O Expressway between Shibetsu Kenbuchi IC from Asahikawa Takasu Interchange (IC), in order to ensure a safe and comfortable driving, as follows: "nighttime road closures We will inform you about pavement repair work etc.

We apologize for the inconvenience and ask for your understanding and cooperation.

In case of bad weather, it will be postponed, so please check the NEXCO EAST Customer Center, Japan Road Traffic Information Center, Highway Telephone, information board, etc. for traffic regulation status.

1 Construction content and construction period

It is a closed road for pavement repair work, lane mark work, cleaning work, facility inspection, etc.

【section】 Asahikawa Takasu IC ~ Shibetsu Kenbuchi IC (upper and lower lines)
【period】 Monday, April 19th, Tuesday, April 20th from 20:00 to 6:00 the next morning (2 nights)
In case of bad weather, it will be postponed at the same time on the following day. (Except Friday, Saturday, Sunday and April 27 (Tue)-May 9 (Sun))

[Construction period calendar]

Calendar: Image images from April 19 (Monday) and April 20 (Tuesday) 20:00 to 6:00 the next morning (2 nights)

In addition, the closed road will be implemented at the same time on General National Road No. 450 [Asahikawa-Monbetsu Expressway (between Hibu JCT and Hiboku IC)] managed by the Hokkaido Development Bureau.

2 Detour

Please detour to general national highways No. 40, 12 and other roads when you are closed.

3 Regarding connection fare adjustment due to "night closure"

Because of road closures due to this construction, Do-O Expressway temporarily flow out, to bypass the general road, the customer is to be Noritsuga in the same direction again, "to give you in the transfer certificate issued IC Expressway ride closures Please receive the "Certificate of transit" ("Certificate of transit"). If you hand over the "transfer certificate" when first paying the fare after transferring at the IC that has designated inflow again within 24 hours, the toll will be adjusted according to the section used. I will. The following table shows the ICs that issue transit certificates and ICs that have been designated to re-enter.

Customers who use ETC do not need to receive a "transit certificate".

Please use the same ETC card once before and after transit, and use ETC wireless communication with both the transit certificate issuing IC and the re-entry designated IC.

・Transmission certificate issuing IC, re-inflow designated IC

Closed section, date and time Transit certificate issuing IC Re-inflow designated IC
Asahikawa Takasu IC ⇔ Shibetsu Kenbuchi IC (upper and lower lines)
Monday, April 19, 20th Tuesday
From 20:00 to 6:00 the next morning (2 nights)
(Customers to Sapporo area)
  • Wakan IC, Hifu JCT, Asahikawa Kita IC
(Customers to Sapporo area)
  • Asahikawa Takasu IC, Fukagawa IC
(Customers to Shibetsu Kenbuchi area)
  • Asahikawa Takasu IC
(Customers to Shibetsu Kenbuchi area)
  • Asahikawa Takasu IC, Asahikawa Kita IC, Bifu Kita IC, Wakan IC
  • After cancellation of traffic closure
  • The "transfer certificate" is valid only if you transfer using the re-inflow designated IC within 24 hours after the issuance.
    Please drive safely according to the information board, regulatory signs and guides.

4 Information during the construction period

Construction regulation information is provided through the following media.

(1) Internet

  • For the latest regulatory information, see DraTra "Please refer to the.
  • The latest traffic information is posted in "Drive Traffic".
    address【http://www.drivetraffic.jp/]
  • You can check "closed information on Expressway Hokkaido" on the "mobile phone website".
    Address (for mobile phones only) [http://hokkaido.e-nexco.co.jp/]
    QR code
    Image of http://hokkaido.e-nexco.co.jp/

(2) Flyers, posters

It is distributed and posted at each service area/parking area on the Expressway, at the toll gate office, and at the Asahikawa Administration Office of Hokkaido Regional Head Office NEXCO EAST.

(3) Telephone

  • 『NEXCO東日本お客さまセンター』
     24時間365日、高速道路に関する様々なお問合せにお答えします。
      電話番号
       0570-024-024(PHS・IP電話のお客さま:03-5338-7524
  • 『ハイウェイテレホン』
     リアルタイムの交通情報(5分更新)を24時間提供しています。
      電話番号
       011-896-1620(札幌)
       0166-54-1620(旭川)
       0143-59-1620(室蘭)
       0155-42-1620(帯広)
       (注)おかけ間違いのないようにご注意ください。
       ♯8162に携帯電話でおかけいただくと、全国どこでも、その場所から最も近い地域の最新の高速道路状況を自動音声で提供します。
  • 『日本道路交通情報センター』
     最新の交通情報を提供しています。
      電話番号
       050-3369-6760

(4) Road traffic information available while driving

  • Road information board
  • Highway radio (1620kHz)