Notice of night traffic closure and IC partial closure on Expressway in Hokkaido

-Road maintenance and repair work-

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Notice of night traffic closure and IC partial closure on Expressway in Hokkaido

July 12, 2017
East Nippon Expressway Co., Ltd.
Hokkaido office

NEXCO EAST Hokkaido Regional Head Office (Atsubetsu Ward, Sapporo City), in order to provide customers with safe, secure, and comfortable use of the Expressway, regular inspections and night traffic closures and interchange (IC) part closure due to road surface repair work to hold.

We apologize for the inconvenience, and we appreciate your understanding and cooperation.

1 closed section and period

Road name section period Main construction contents Attachment
E5
Do-O Expressway
Chomanbu IC

Toyoura IC
Jul. 24 (Mon) - Aug. 2 (Wed)
[8 nights except Saturday and Sunday]
20:00 - 6:00
Pavement repair work Leaflet-1 [PDF: 220KB]
E38
Doto Expressway
Tokachi Shimizu IC

Otofuke Obihiro IC
Jul. 24 (Mon) - Aug. 3 (Thu)
Aug. 21 (Mon) - Aug. 24 (Thu)
[12 nights except Friday, Saturday and Sunday]
20:00 - 6:00
Pavement repair work
Inspection of various equipment
Leaflet-2 [PDF:257KB]
Tokachi Shimizu IC

Memuro IC
Aug. 28 (Mon) - Aug. 30 (Wed)
[3 nights]
20:00 - 6:00
Pavement repair work
Inspection of various equipment
  • In case of bad weather, it will be postponed at the same time from the next day.
  • Please see the attached leaflet for detours and spare days for postponement.

2 Part of IC closure and period

Road name Location period Main construction contents Attachment
E5
Do-O Expressway
Kitahiroshima IC
(Entrance to Sapporo)
Jul. 24 (Mon) - Jul. 25 (Tue)
[2 night]
20:00 - 6:00
Pavement repair work Leaflet-3 [PDF: 116KB]
Noboribetsu East IC
(exit)
Jul. 24 (Mon) - Jul. 28 (Fri)
[5 night]
20:00 - 6:00
Pavement repair work Flyer-4 [PDF: 113KB]
  • In case of bad weather, it will be postponed at the same time from the next day.
  • Please see the attached leaflet for detours and spare days for postponement.

3 Information during the construction period

Construction regulation information is provided through the following media.

  1. the Internet
    • For the latest regulatory information, see DraTra "Please refer to the.
    • Drive traffic ] For the latest traffic information.
  2. Flyers, posters, highway information terminals
    Each service area / parking area of ​​toll roads, toll office office, NEXCO EAST Hokkaido branch office each management office etc. distributed and posted.
  3. phone
    • 『NEXCO東日本お客さまセンター』
      24時間365日、高速道路に関する様々なお問合せにお答えします。
      電話番号
      0570-024-024 (PHS・IP電話のお客さま:03-5338-7524
    • 『ハイウェイテレホン』:リアルタイムの交通情報(5分更新)を24時間提供しています。
      電話番号
       011-896-1620(札幌)
       0166-54-1620(旭川)
       0143-59-1620(室蘭)
       0155-42-1620(帯広)
       (注) おかけ間違いのないようにご注意ください。
      #8162」に携帯電話でおかけいただくと、全国どこでも、その場所から最も近い地域の最新の高速道路状況を自動音声で提供します。
    • 『日本道路交通情報センター』:最新の交通情報を提供しています。
      電話番号
      050-3369-6760
  4. Road traffic information available while driving
    • Road information board
    • Highway radio (1620kHz)
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.