[E5A] Notice of establishment of Sasson Expressway Asari Main Line Toll Office (Sapporo direction)

-Start of operation at 0:00 on November 30, 2018 (Friday)-

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • [E5A] Notice of establishment of Sasson Expressway Asari Main Line Toll Office (Sapporo direction)

PDF version [PDF: 327KB]

November 16, 2018
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

With the opening of the E5A Shiribeshi Expressway (Yoichi IC-Otaru JCT), NEXCO EAST Hokkaido Regional Head Office (Atsubetsu-ku, Sapporo City) will use the E5A Sasson Expressway Asato Main Line to identify routes from the Otaru IC and Yoichi IC directions. A new toll office (in the direction of Sapporo) will be set up.

Please note that the traffic method will change as follows.
There is no change in toll fees.

1 Operation start date and time

Friday, November 30, 2018 0:00

2 How to pass

Please use the newly installed Asari main line toll gate (direction Sapporo) as follows.

Customers using ETC wireless communication

Reduce the speed of ETC-dedicated lanes or mixed lanes (ETC / general) to 20 km / h or less, and drive slowly.

Customers such as cash

Please stop at the general lane or mixed lane (ETC / general) and pick up a pass from the automatic ticket machine. Please hand the ticket to the staff at the exit.

3 Toll gate image

Image of toll booth image (before installation)
Before installation
Image of toll booth image (after installation)
After installation

4 Location map

Image of position map

5 Tollgate lane layout

The lane layout after the start of operation is as follows.

Image of lane layout after operation started
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.