Tohoku Expressway Kuroiso Parking Area will be closed all day and nighttime detour restrictions will be applied.

-(Tentative name) Build the Kuroiso Interchange Bridge-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Tohoku Expressway Kuroiso Parking Area will be closed all day and nighttime detour restrictions will be applied.

May 8, 2008
East Nippon Expressway Co., Ltd. Kanto Regional Head Office

(Tentative name) Kuroiso Interchange bridge construction completed, Kuroiso parking area Tuesday, June 10 We have resumed business since. Thank you for your cooperation.

Added on June 10, 2008

NEXCO EAST Kanto Regional Head Office (Taito-ku, Tokyo, Shinichi Ishikawa Regional Head Office President) is working on construction of the Kuroiso Interchange jointly with Tochigi Prefecture, aiming for completion in 2008 (tentative name) with the aim of alleviating traffic congestion during the holiday season. I am.

The Kuroiso parking area (In-bound and Out-bound lines) will be closed all day for construction work to build an interchange bridge across the Tohoku Expressway (construction work).

During this period, please use other service areas and parking areas.

In addition, detour restrictions will be implemented for two nights of this period. Please drive carefully according to the signs on site.

1 Overview of all-day closure and nighttime detour regulations

(1) Place
Tohoku Expressway Kuroiso Parking Area (In-bound / Out-bound lines)
(Between Nishi Nasuno Shiobara IC and Nasu IC)

(2) Closed all day
From Monday, June 2, 2008 to Friday, June 13, 2008 (12 days including Saturday, Sunday and night)
During this period, all facilities (parking lots, toilets, shops) in the Kuroiso parking area (In-bound / Out-bound lines) cannot be visited. The closing period may change depending on the weather.

(3) Nighttime detour regulation
During the all-day closing period, we will detour to 2 nights (7:00 pm to 6:00 am the next morning) and to the Kuroiso parking area (In-bound / Out-bound lines).
In front of the parking area, usually two lanes on each side will be reduced to one lane, and then you should detour from the main line to the aisle (lane) in the parking area.

(4) Construction content
(Tentative name) With the new construction of the Kuroiso Interchange, a bridge will be constructed across the Tohoku Expressway Main Line and the Kuroiso Parking Area.
This time, after closing the parking area, we installed gate-type equipment in part of the aisle (lane) in the parking area, and when building a bridge, detour from the main line into the parking area and run in the gate-type equipment. We have made it a method that does not enclose traffic.
By this method, you can avoid the inconvenience caused by the traffic jams (Expressway and general roads) caused by traffic closures.
Please note that the parking area must be closed during "Installation of gate-type equipment-Detour control-Removal of gate-type equipment".

2 Notification method

  1. We will post posters and leaflets in the service area and parking area.
  2. Post banners on overpass bridges on Expressway.
  3. In front of the Kuroiso parking area (In-bound and Out-bound lines), we will inform you by signs and road information boards that it is closed or detour regulation is in progress.
  4. NEXCO EAST The free magazine "Highway Walker" distributed in the service area and parking area will be posted.
  5. Broadcast on highway radio (1620kHz). However, we cannot inform you if there is other priority traffic information.
  6. 当社ホームページにこの記者発表資料を掲載します。
    URL  http://www.e-nexco.co.jp/

[Reference Material]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.