Return the bypass road at Tohoku Expressway to its original lane
Kita-Kanto Expressway Iwafune JCT (tentative name) construction work-
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- Return the bypass road at Tohoku Expressway to its original lane
September 19, 2008
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office
Utsunomiya Construction Office
NEXCO EAST Utsunomiya Construction Office (Utsunomiya City, Tochigi, Director: Kenji Shiimoto), since September 2007, along with the construction of Iwafune Junction (tentative name) that connects the Kita-Kanto Expressway and the Tohoku Expressway Tohoku Expressway I had set up a detour road to turn around the lane, but since the related work was completed this time, I will return the lane from the detour road to the original lane of the Tohoku Expressway road.
In addition, due to this switching work, we will regulate the continuous lanes on the up and down lines between Sano Fujioka IC and Tochigi IC.
1 Overview of detour road installation
(1) Outline
Number of lanes: 3 lanes on each side
Regulated speed: 100km/hour
Installation period: September 2007 to September 2008 (about 1 year)
(2) Construction details during the detour period
Construction of structures (bridge, Hakobuchi) for the current Tohoku Expressway and Kita-Kanto Expressway to cross over.
2 Traffic restrictions associated with switching from the bypass road to the original lane
Due to this switching work, the Tohoku Expressway upper and lower lines will be subject to the following day and night continuous lane restrictions.
(1) Date and time
[Out-bound line]
From Monday, September 29, 2008 7:00 to Tuesday, September 30, 2008 24:00 *
[Preliminary days: Monday, October 6, 2008 7:00* to Tuesday, October 7, 2008 24:00*]
[In-bound]
Until from Wednesday, October 1, 2008 6:00 to Thursday, October 2, 2008 24:00 ※
[Preliminary day: Wednesday, October 8, 2008 7:00 to Thursday, October 9, 2008 24:00 *]
*Updated on September 29 due to schedule changes.
In case of stormy weather, it will be postponed to the preliminary day of the next week.
(2) Lane regulation section
Some sections (about 5km) between Sano Fujioka interchange and Tochigi interchange
(3) Method of notification regarding traffic regulation
- Information signs will be installed in service areas and parking areas.
- Post banners on overpass bridges on Expressway.
- Displays that traffic restrictions are being applied to the Expressway information signs.
- Broadcast on highway radio (1620kHz). (Except when there is other priority traffic information.)
- 当社ホームページにこの記者発表資料を掲載します。(URL http://www.e-nexco.co.jp/)
【Document】

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.
関連サイト・コンテンツ
料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。
リアルタイムの渋滞・規制情報をお探しの方はこちら。
災害時の通行止めなどの道路情報をお探しの方はこちら。