Kan-Etsu Expressway Tsukiyono IC Entrance Notice at Night Partial Closure

From Monday, November 3 to Friday, November 7 (4 nights)
~ Tsukiyono IC can be used by detour. ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Kan-Etsu Expressway Tsukiyono IC Entrance Notice at Night Partial Closure

October 17, 2014
*Added on November 6, 2014
East Nippon Expressway Co., Ltd.
Takasaki Management Office

(Added on November 6, 2014)
The pavement repair work on the Kan-Etsu Expressway Tsukiyono IC, which was carried out from November 3 (Monday) to November 7 (Friday) with the entrance partially closed at night, progressed smoothly than planned, Ends at 6:00 on the 6th (Thursday) I will let you know. Thank you for your cooperation during the construction period.

NEXCO EAST Takasaki Management Office (Takasaki City, Gunma Prefecture), pavement repair work will be carried out at the second interchange that connects the toll gate of the Kan-Etsu Expressway Tsukiyono Interchange (IC) and a general road.

As a result of this construction, customers using the exits from Route 17 Niigata and Route 17 Tokyo should use the detour and use the Tsukiyono IC.

We apologize for the inconvenience, but we kindly ask for your understanding and cooperation so that you have enough time when you go out.

1 Lamp closure location and date and time

(1) Lamp closing location

Kan-Etsu Expressway Tsukiyono IC (outside the ramp from the general road (National Route 17) to the toll booth)

  • Expressway take Route 17 towards Niigata (G ramp)
  • From the National Highway No. 17 Tokyo area Expressway closure of the entrance (H lamp)

* National Route 17 Tokyo exit and National Route 17 Niigata entrance are available as usual.

Image of the lamp closing point

(2) Date and time

It was finished at 6:00 on Thursday, November 6 from 20:00 on Monday, November 3, 2014

Image image of lamp closing date and time

2 Detour route map

During the regulation period due to construction, Tsukiyono IC can be used in and out of the Expressway by diverting to an available ramp.

Image of detour map

3 Construction overview

We will repair damages such as steps and cracks on the pavement surface to improve running performance and safety.

Image of road damage
Road surface damage
Image of road repair situation
Road surface repair status

4 How to obtain road traffic information regarding traffic restrictions

(1) Construction signs

  • A notice of construction will be posted on the main line, toll gates, general roads around Tsukiyono IC, and Route 17 Tsukiyono Information Terminal.
  • We will post and distribute leaflets in the service area (SA), parking area (PA), etc.

(2) Road traffic information that can be obtained before going out

  • NEXCO東日本お客さまセンター
    ナビダイヤル:0570-024-024 (24時間オペレーターが対応)
    TEL:03-5338-7524 (PHS、IP電話のお客さま)
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル#8011
    全国・関東甲信越情報 050-3369-6600
    インターネット http://www.jartic.or.jp/
  • ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
    前橋局 027-252-1620(携帯電話・PHS短縮ダイヤル #8162

(3) Road traffic information available while driving

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road traffic information can be obtained with VICS-compatible onboard equipment such as car navigation.