[C3] Gaikan Expressway Night Closure and Bijogi JCT Night Closure Notice
~ We will replace the sign board ~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [C3] Gaikan Expressway Night Closure and Bijogi JCT Night Closure Notice
The latest regulatory information isDraTraPlease see.
May 15, 2020
East Nippon Expressway Co., Ltd.
Misato Management Office
NEXCO EAST Misato Management office (Misato city, Saitama prefecture) C3 In order to carry out signboard replacement work at the main line of Gaikan Expressway (hereinafter "gaikan-do") and the junction of Bijogi (hereinafter "JCT"), we will carry out nighttime closures and nighttime closures.
We apologize for the inconvenience, but we kindly ask for your understanding and cooperation so that you may have some time when you go out.
1 Night-time closed sections / night-closed locations and dates / times
number | section | period | Attachment |
---|---|---|---|
【1】 |
| Implementation date: Monday, June 8 [1 night] From 23:00 to 4:00 the next morning Preparation day: June 9th (Tue) 2020 (Thurs) Every night from 23:00 to 4:00 the next morning | [Attachment 1] [PDF: 3.0MB] |
【2】 |
| Implementation date: Monday, June 15 [1 night] (1) From 23:00 to 4:00 the next morning (2), (3) From 20:00 to 5:00 the next morning Preparation day: June 16th (Tue) 2020 (Thursday) (1) Every night from 23:00 to 4:00 the next morning (2), (3) Every night from 20:00 to 5:00 the next morning | [Attachment 2] [PDF: 741KB] |
- In stormy weather, it will be postponed to the spare day.
- We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.
2 Detour
[Attachment 1] See [2. Detour] in [Attachment 2].
Detours will increase the time required, so please take time to go out.
3 Transfer adjustments due to suspension of traffic
For passengers who temporarily flow out of the Expressway due to suspension of traffic, bypass the closed section, re-enter and transfer in the forward direction, we carry out "transit adjustment" to adjust the toll according to the section used. I will.
Regarding transfer adjustment, refer to “3. Information on transfer adjustment” in [Attachment 1] [Attachment 2].
4 Construction overview
Signboard replacement work will be carried out to number the signboards on the outer ring road and Bijogi JCT. Since it is not possible to carry out the work under normal lane regulations, it is necessary to carry out the work by blocking the main line and closing the ramp. Therefore, in order to avoid inconvenience to our customers as much as possible, we will close the main line and close the lamps during the night of weekdays when traffic is light, and carry out the work intensively and efficiently. This work is necessary for safe and comfortable use of the Expressway so we ask for your understanding and cooperation.
5 How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
- A banner will be posted on the gate-shaped signpost on the Expressway.
(2) Road traffic information that can be obtained before going out
- NEXCO EAST Customer Center (corresponding to 24 hour operator)
- NEXCO EAST Road Traffic Information Site "DraTra "
- Japan Road Traffic Information Center (JARTIC) Road Traffic Information
全国共通ダイヤル 050-3369-6666(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
埼玉情報 050-3369-6611
【PC】 - Highway telephone (Provides the latest information updated every 5 minutes for 24 hours)
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.