[C3] Gaikan Expressway Inner Wako Kita IC ⇒ Oizumi JCT Night closure notice

Monday, July 27, from 23:00 to 4:00 the next morning
-We will carry out sign board replacement work-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C3] Gaikan Expressway Inner Wako Kita IC ⇒ Oizumi JCT Night closure notice

The latest regulatory information is DraTraPlease see.

June 29, 2020
East Nippon Expressway Co., Ltd.
Misato Management Office

NEXCO EAST Misato Management Office (Misato City, Saitama) C3 Gaikan Expressway (“Outer Ring Road”) Inner route Wako-Kita Interchange (“IC”) to Oizumi Junction (“JCT”) to replace signboards. I will carry it out.
We apologize for the inconvenience, but we kindly ask for your understanding and cooperation so that you may have some time when you go out.

1. Night-time closed sections/night-closed locations and dates/times

(1) Night closed sections/Night closed locations

Outer ring road

(Inner route) Wako Kita IC ⇒ Oizumi JCT

Outer ring road

(Inner route) Wakokita IC entrance lamp (entrance from National Route 298 to Oizumi)

Outer ring road

(Inner ring) Wako IC entrance lamp (entrance from National Route 254 to Oizumi)

Image image of night-time closed sections/night-closed points

  • Attached to the line C3 The indication such as shows the route number (numbering) of Expressway.

(2) Date and time

Date: 2020 Monday, July 27, 23:00 to 4:00 the next morning
Preliminary day: 2020 July 28th (Tue)-30th (Thursday) 23:00 pm to 4:00 am the next day

Image image of the nighttime closing time

image image of twitter OR code

* Due to the closure of the outer ring road (inner route) Wako Kita IC ⇒ Oizumi JCT, Araikura PA cannot be used. In addition, after using Aikura PA, it cannot flow into the outer ring road (inner route).
*In case of stormy weather, it will be postponed to the spare day.
*Construction decision will be announced on Twitter by 17:00 on the day.

2. Detour

For detour Attachment [PDF: 1.58MB] Please refer to.
Detours will increase the time required, so please take time to go out.

3.Outline of construction

Outer Ring Road Inner Circumference Wako Kita IC ⇒ Oizumi JCT We will carry out signboard replacement work to carry out numbering on the signboard. Since it is not possible to carry out the work under normal lane regulations, it is necessary to carry out the work by blocking the main line and closing the ramp. Therefore, in order to avoid inconvenience to our customers as much as possible, we will carry out construction work intensively and efficiently by blocking the main line and closing the lamps on weekdays during the night when traffic is light. This work is necessary for safe and comfortable use of the Expressway so we appreciate your understanding and cooperation.

Image image of construction outline

4. How to get traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the gate-shaped signpost on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway
  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
* Twitter's official account "NEXCO EAST (Kanto)" ( @e_nexco_kanto ) Also distributes information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.