[CA] Notice of nighttime closure of Tokyo Wan Aqua-Line Expressway

January 24th (Sun) -January 28th (Thursday), 3rd year of Reiwa
-Tunnel fall prevention work and inspection of road structures-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [CA] Notice of nighttime closure of Tokyo Wan Aqua-Line Expressway

The latest regulatory information isDraTraPlease see.

December 14, 2020
East Nippon Expressway Co., Ltd.
Tokyo Wan Aqua-Line Expressway Management Office

NEXCO EAST Tokyo Wan Aqua-Line Expressway Management Office (Kisarazu City, Chiba Prefecture), CA Tokyo Wan Aqua-Line Expressway (hereinafter "Aqualine") up and down line Kawasaki Ukishima Junction (hereinafter "JCT") to Kisarazu Kaneda Interchange (hereinafter "JCT") Hereafter "IC") and CA Tokyo Wan Aqua-Line Expressway access road (hereinafter "Aqua-In-bound line From Sodegaura IC to Kisarazu Kaneda IC Tunnel fall prevention work and inspection of road structures Therefore, we will close the road at night.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. Closed section and date and time

(1) Closed section

Aqua Line
Up and down line Kawasaki Ukishima JCT-Kisarazu Kaneda IC
Aqua connecting road
In-bound line Sodegaura IC ⇒ Kisarazu Kaneda IC
Image image of closed section
  • The indication of CA etc. attached to each line shows the line number (numbering) of the Expressway

(2) Date and time

Implementation date:
January 24th (Sun) -January 28th (Thursday), 3rd year of Reiwa
Every day from 23:00 to 5:00 the next morning
Preparation day:
January 31st (Sun) -February 4th (Thursday), 3rd year of Reiwa
Every day from 23:00 to 5:00 the next morning
February 7th (Sun) -February 9th (Tue), 3rd year of Reiwa
Every day from 23:00 to 5:00 the next morning
Image of date and time
Image of QR code
  • Rest facilities within the closed section will be closed as follows.
    Aqualine Umihotaru Parking Area 21:00 pm to 5:00 the next morning
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the attached sheet [PDF: 1.1MB] for the detour.
The detour will take longer, so please leave plenty of time.

3. Construction overview

Twenty-three years have passed since the opening of the Aqua Line, so in order to keep the road structure in good condition, we will carry out tunnel fall prevention work and road structure inspection. Since it is not possible to carry out construction and inspection under normal lane regulations, it is necessary to close the road and carry out the work.
Therefore, in order to avoid inconvenience to customers as much as possible, we will close traffic at night when traffic is light and carry out construction intensively and efficiently. This work is necessary for you to use the Expressway safely and comfortably, so we ask for your understanding and cooperation.

Photograph of structure inspection status 1
Photograph of structure inspection status 2

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway information terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA/PA.
  • VICS
    Road traffic information can be obtained from VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.