[C3] Gaikan Expressway Misato JCT Nighttime ramp closure notice

March 7th (Monday) and 8th (Tuesday) from 21:00 pm to 4:00 am the next morning
-We will dismantle the scaffolding for bridge repair-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C3] Gaikan Expressway Misato JCT Nighttime ramp closure notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 579KB]

February 21, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Taniwahara Management Office

At NEXCO East Japan Taniwahara Management Office (Tsukubamirai City, Ibaraki Prefecture), the scaffolding for bridge repair is dismantled at the ramp of C3 Tokyo Gaikan Expressway (hereinafter "Gaikan Expressway") Misato Junction (hereinafter "JCT"). We will close the lamp at night to do the work.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. 1. Closing location and date and time

  1. Closed place
    A ramp that flows from the Gaikan Expressway (toward Oizumi) and National Highway No. 298 (toward Soka) to the Metropolitan Expressway (hereinafter referred to as "Shuto Expressway") and the Misato Line (toward Ginza).
    • The entrance to the Metropolitan Expressway Misato is also not available
  2. Image of closed area
    • Attached to each line C3 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    March 7th (Monday) and March 8th (Tuesday), 4th year of Reiwa
    Every day from 21:00 pm to 4:00 the next morning
    Preparation day:
    Reiwa 4th March 9th (Wednesday) -March 10th (Thursday)
    Every day from 21:00 pm to 4:00 the next morning
Image of closing date
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the attached sheet [PDF: 316KB] for detouring.
The detour will take longer, so please leave plenty of time.

3. Construction overview

Currently, at Misato JCT on the outer ring road, we are carrying out bridge peeling countermeasures using scaffolding for bridge repair.
Now that the anti-scraping work has been completed, we will dismantle the scaffolding for bridge repair. The section where this work is done is one lane, and it is not possible to work under normal lane regulations when carrying out the work, so it is necessary to close the ramp.
Therefore, we will close the lamps on weekday nights when traffic is light so as not to cause any inconvenience to our customers, and carry out the work intensively and efficiently. We ask for your understanding and cooperation as this is a necessary task for using the Expressway safely and comfortably.

Image image of closure regulation image Image image of caption of closure regulation image
Image of scaffolding for bridge repair Dismantling range Image of caption of scaffolding for bridge repair

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at rest facilities around the area.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.