[E83] Notice of closure of entrance to Kawakami IC on Yokohama-Shindo Road Out-bound line

May 20th (Mon) to 23rd (Thu) 8am to 5pm each day
~ Installation of soundproofing walls ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Notice of closure of entrance to Kawakami IC on Yokohama-Shindo Road Out-bound line

The latest regulatory information isDraTraPlease see.

PDFバージョン【PDF:874KB】

April 26, 2024
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama, Kanagawa Prefecture) will be closing the ramp at the entrance to Kawakami Interchange (hereinafter referred to as "IC") on the E83 Yokohama-Shindo Road Out-bound lane to carry out construction work to install a soundproof wall.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. 1. Closing location and date and time

  1. Closures:
    Yokohama-Shindo Road Out-bound Line Kawakami IC (towards Odawara) Entrance Ramp
  2. Image of closed area
    • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    May 20th (Mon) - 23rd (Thu), 2024
    8:00-17:00 each day
    Preparation day:
    May 27th (Mon) - 30th (Thu), 2024
    8:00-17:00 each day
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • We will announce the decision on whether construction will be carried out on the previous day around 5pm on Twitter (X) etc.

2. Detour

Please refer to the diagram below for detours.
As indicated by  the blue arrows, if you take a detour between Yokohama-Shindo Road Kawakami IC and Totsuka IC via Higashi-Totsuka West Line, Prefectural Route 218, Circular Route 2, and National Route 1, the estimated travel time will be approximately 11 minutes (usually approximately 2 minutes).

Detours will increase the time required, so please take time to go out.

Image of detour
Legend image image

3. Construction overview

Construction work will be carried out to install soundproofing walls at the entrance to Kawakami IC on the Yokohama-Shindo Road Out-bound lane.
The section where this work will be carried out is one lane, and since it cannot be carried out under normal lane restrictions, it is necessary to close the entrance to Out-bound lane to carry out the work. Therefore, in order to minimize inconvenience to customers, we will close the ramps on weekdays and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Photo of soundproof wall construction work Image of the caption for the soundproof wall construction work status 1
Image of soundproof wall construction work Image 2 of the caption for the soundproof wall construction work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.