[E51] Notice of nighttime closure of Daiei PA on Higashi-Kanto Expressway In-bound

May 19th (Mon) to May 20th (Tue) from 8pm to 5am each day
~ Repair work on damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E51] Notice of nighttime closure of Daiei PA on Higashi-Kanto Expressway In-bound

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 784KB】

May 2, 2025
East Nippon Expressway Co., Ltd.
Chiba Management Office

NEXCO EAST The Chiba Management Office (Chiba City, Chiba Prefecture) will be closed at night to carry out pavement repair work at the ramp of the E51 Higashi-Kanto Expressway (hereinafter referred to as "Higashi-Kanto Expressway") In-bound Line Daiei Parking Area (hereinafter referred to as "Daiei PA"). Please note that you will not be able to use the convenience store (Seven-Eleven) or toilets in the PA during the closure.
We apologize for any inconvenience this may cause, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. Closed location and date and time

  1. 閉鎖箇所:
    東関東道 上り線 大栄PA 資料1【PDF:230KB】
  2. Image of closed area
    • Attached to each line E51 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    令和7年5月19日(月)~20日(火)
    Every night from 20:00 to 5:00 the next morning
    Preparation day:
    令和7年5月21日(水)~26日(月)
    [Excluding Fridays, Saturdays, and Sundays] 8:00 p.m. to 5:00 a.m. the following day
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Construction overview

Due to damage to the pavement at the ramp of Daiei PA on the East Kanto In-bound, pavement repair work will be carried out. The section in which this work will be carried out is a single lane, and since the work cannot be carried out under normal lane restrictions, it is necessary to close the ramp to carry out the work.
Therefore, in order to minimize inconvenience to customers, we will close the ramps at night on weekdays when traffic volume is low, and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Photo of pavement damage situation
Image of caption of pavement damage situation
Pavement repair work work status photo
Image of caption of work status for pavement repair work

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information

4. Business hours of commercial facilities

Due to construction work, the commercial facilities at Daiei PA (In-bound) will be closed and their opening hours will be as follows:
In addition, the walk-in gate will also be closed due to the closure of the commercial facility. We apologize for any inconvenience this may cause, and appreciate your understanding and cooperation.

Business hours change
Eligible facilities
Opening hours during the closure Normal business hours
Seven-Eleven Closes at 7:30pm
Opens at 5am the next morning
24hours
  • During the closure, ATMs and other facilities within commercial facilities will also be unavailable.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.