[E16] Notice of nighttime ramp closure at Shinhodogaya IC Yokohama-Shindo Road Shindo

September 24th (Wed) to 25th (Thu) from 10:30pm to 5am the following morning
~ We will install a suspended scaffold for repainting work ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E16] Notice of nighttime ramp closure at Shinhodogaya IC Yokohama-Shindo Road Shindo

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 483KB]

September 10, 2020
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama, Kanagawa Prefecture) will be closing the ramps at Shinhodogaya Interchange (hereinafter referred to as "IC") on the E16 Yokohama-Shindo Road Shindo at night to install scaffolding for repainting work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed location and date and time

  1. Closed area
    Yokohama-Shindo Road Shinhodogaya IC
    ① The ramp leading from Yokohama-Shindo Road In-bound lane to the Fujitsuka IC exit
    ②Ramp leading from Yokohama Yokosuka Road (In-bound) to Yokohama-Shindo Road In-bound)
  2. Image of closed area
    • Attached to each line E16 The indication such as shows the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    Wednesday, September 24th to Thursday, September 25th, 2020
    Every night from 10:30pm to 5am the next morning
    Preparation day:
    September 29th (Monday) to September 30th (Tuesday), 2020
    Every night from 10:30pm to 5am the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Bus operation

When the ramps are closed at night, Sotetsu Bus (Route: Hama 17) that travels on Yokohama-Shindo Road In-bound lane will operate as usual.

3. Detour

For detours, please refer to the attached document [PDF: 380KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

Four. work outline

Yokohama-Shindo Road Hanging scaffolds will be installed at each ramp of the Shin-Hodogaya IC for the repainting work.
Since it is not possible to install the hanging scaffolds under normal lane restrictions, it is necessary to close the ramps at the Shin-Hodogaya Interchange for the work.
Therefore, to minimize inconvenience to customers, the ramp will be closed at night on weekdays when traffic volume is low, so that the work can be carried out in an intensive and efficient manner. Since this work is necessary for the safe and comfortable use of Expressway, we ask for your understanding and cooperation.

Photo 1 of suspended scaffolding installation image Image of the caption for the installation image of the suspended scaffolding 1
Photo 2 of suspended scaffolding installation image Image 2 of the caption for the installation image of the suspended scaffolding

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.