[E6] Notice of Closure of Joban Expressway Night Lights
~We will carry out pavement repair work~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [E6] Notice of Closure of Joban Expressway Night Lights
The latest regulatory information isDraTraPlease see.
October 27, 2020
East Nippon Expressway Co., Ltd.
Mito Management Office
NEXCO EAST Mito Management Office (Mito City, Ibaraki Prefecture) will be closing the ramps at night at the interchange (hereinafter referred to as "IC") on the E6 Joban Expressway (hereinafter referred to as "Joban Expressway") in order to carry out pavement repair work on the ramps.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.
1. Lamp closure location and date and time
| number | Road name | Closed point | period | Attachment |
|---|---|---|---|---|
| ① | E6 Joban Expressway | Hitachi Chuo IC on the In-bound line (From Hitachi Chuo Toll Gate to Joban Expressway In-bound) (Ramp leading to Tokyo) |
November 10th (Monday) - November 11th (Tuesday) 8:00 PM to 5:00 AM the next morning |
Material-1 [PDF: 779KB] |
| ② | Out-bound Kita IC on the outbound line (From Joban Expressway Out-bound line, Tokyo direction (Ramp leading to Hitachikita toll gate) |
November 12th (Wednesday) - 13th (Thursday) 8:00 PM to 5:00 AM the next morning |
Material-2 [PDF: 595KB] | |
| ③ | Hitachi Kita IC (National Route 6 towards Mito and Iwaki (ramp coming in from |
November 14th (Friday) 8:00 PM to 5:00 AM the next morning |
Material-3 [PDF: 624KB] | |
| ④ | Iwama IC on the Out-bound line (From Joban Expressway Out-bound line, Tokyo direction (Ramp leading to Iwama Toll Gate) |
November 17th (Monday) - November 18th (Tuesday) 8:00 PM to 5:00 AM the next morning |
Material-4 [PDF: 701KB] |
- Attached to each line E6 The indications such as indicate the route number (numbering) of Expressway.
- In stormy weather, it will be postponed to the spare day.
- Please see the attached document [PDF: 1.5MB] for information on backup dates and detours in case of postponement.
- After the construction work for closure ① is completed, the construction work for closure ② will be carried out, so closures ① and ② will not be carried out simultaneously.
- If Closure ②, Closure ③, or Closure ④ is postponed due to bad weather, construction will be carried out on a backup date after Wednesday, November 19th. The order of construction on the backup date will be ② ⇒ ③ ⇒ ④.
- The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.
2. Detour
Please refer to Appendices 1 to 4 [PDF: 1.5MB] for detours.
The detour will increase travel time, so please allow yourself plenty of time when traveling.
3. Construction overview
Due to damage to the road surface at each interchange on Joban Expressway, pavement repair work will be carried out.
Since construction work cannot be carried out under normal lane restrictions, it is necessary to close the ramps to carry out the work. Therefore, in order to minimize inconvenience to customers, we will close the ramps at night on weekdays when traffic volume is low, and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time information[Mobile] http://m.drivetraffic.jp/Construction regulation information
- 日本道路交通情報センター(JARTIC)道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
茨城情報 050-3369-6608
【PC】https://www.jartic.or.jp/
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on official X (formerly Twitter) and LINE accounts.
[X (old Twitter)]
"NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
“NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
[LINE]
"NEXCO EAST" (@e-nexco) Road closures and weather information
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.
関連サイト・コンテンツ
料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。
リアルタイムの渋滞・規制情報をお探しの方はこちら。
災害時の通行止めなどの道路情報をお探しの方はこちら。