[E18] Joshin-Etsu Expressway and [E19] Nagano Expressway
Notice of all-day lane restrictions due to tunnel and bridge renovation work.

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Notice of all-day lane restrictions due to tunnel and bridge renewal work on the Joshin-Etsu Expressway (E18) and Nagano Expressway (E19).

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 1.4MB]

Expressway renewal project logo image image 1

July 17, 2020
East Nippon Expressway Co., Ltd.
Nagano Construction Office

NEXCO EAST Nagano Construction Office (Nagano City, Nagano Prefecture) will implement all-day lane restrictions on E18 Joshin-Etsu Expressway (hereinafter "Joshinetsu Expressway") and E19 Nagano Expressway (hereinafter "Nagano Expressway") due to renewal work on aging tunnels and bridges. We apologize for any inconvenience this may cause to our customers, but please observe the speed limit and cooperate with safe driving within the regulated section.
Additionally, lane restrictions are expected to cause congestion, mainly on Sundays. For customers planning to use the eligible sections, please check transportation information on websites such as "DraTra," and adjust your usage time slot or allow extra time when using the service. This construction is necessary to ensure safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

1. 1. Overview of lane regulations

number section Regulation form period Congestion Forecast Construction content Details
Joshinetsu Expressway In-bound
Saku IC ⇒ Usui Karuizawa IC
All day lane regulation August 19th - December 24th centered around holidays
Up to over 5km
  • tunnel construction
  • Bridge construction
別紙-1【PDF:823KB】
Nagano Expressway In-bound
Koshoku IC ⇒ Mayo IC
All day lane regulation August 17th - December 10th Up to over 5km
  • tunnel construction
別紙-2【PDF:792KB】
Image image of lane regulation outline

2. Requests for Use

  1. Due to construction work, lane restrictions will be in place on In-bound lanes all day, reducing the number of lanes in each direction from the current two lanes to one. Because the lane width will be narrower in the lane-restricted section, please observe the speed limit, maintain a safe following distance, and take extra care to avoid rear-end collisions. Also, please be aware that lane positions may change as the construction progresses.
  2. On Saturdays and Sundays, In-bound lane will be closed around the Sakudaira Smart Interchange on the northbound lanes, reducing the number of lanes in each direction from the current three to two. When driving, please observe the speed limit, maintain a safe distance between vehicles, and take sufficient precautions to avoid rear-end collisions. Also, there will be vehicles merging onto the main road from the Sakudaira Smart Interchange, so please drive carefully and pay close attention to what's ahead.
  3. Construction vehicles may come and go around the construction site, so please be careful when driving ahead.
  4. During the restricted period, traffic congestion may cause slower traffic flow. Before you go out, please check the latest lane restrictions and traffic information on the websites listed in "3. How to obtain traffic information". Also, please allow extra time for your journey.
  5. During the construction period, we will provide information on construction restrictions using LED information boards and road signs, and call for caution to ensure safe driving. Please check this information before driving and drive safely.

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Posters, leaflets and digital signage will be posted at nearby toll booths, SA and PA.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • We also distribute information through our official accounts on X (formerly Twitter) and LINE.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" @e_nexco_kanto) Expressway
    "NEXCO EAST (Kanto Construction Regulations)" @e_nexco_kanto_k) Decision on implementing construction restrictions
    [LINE]
    "NEXCO EAST" @e-nexco) Road closures and weather information
Expressway renewal project logo image image 2

Expressway renewal project
Now, safety and security are passed on to the next generation.
NEXCO EAST will work on the renewal and repair business of Expressway in order to deliver safety and security to everyone.
Or search for "high-speed renewal".

Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.