About conduct of road closure due to earth and sand disaster

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • About conduct of road closure due to earth and sand disaster

August 15, 2008
As of 3:45
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Regional Head Office (Sendai Aoba-ku, Regional Head Office length: Mikio Kashima) in, from 35 pm 1 due to the occurrence of landslides due to rain Yamagata Expressway was conducted the closures of Shonai Airport IC ~ Sakata IC (up and down line) ..

In addition, the Tohoku Regional Head Office Disaster Countermeasures Headquarters was set up in the event of a disaster.

1 Closing due to landslides

Section Yamagata Expressway Shonai Airport IC-Sakata IC (upper and lower lines)

2 Outline of sediment disaster

  1. Disaster location
    Between Shonai Airport IC and Sakata IC (Out-bound line) Cut slope of cut slope 139.6kp
    • There are no injuries or traffic accidents associated with this disaster.
  2. Disaster scale
    Sediment is flowing over the upper and lower lines (two lanes).
    • Considering the rainfall situation, etc., we will start the damage situation investigation and earth removal work as soon as the local safety can be secured.

3 Closure of other sections due to rain

Yamagata Expressway Tsuruoka IC-Shonai Airport IC (No disaster occurred in the relevant section)

Please check the JARITC website for the latest regulatory information.
http://www.jartic.or.jp/