About result of winter tire wearing situation investigation on Expressway
-November 17, 2008 implementation-
- Corporate Top
- Press Room
- Press Release Tohoku office
- About result of winter tire wearing situation investigation on Expressway
November 19, 2008
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Regional Head Office (Aoba-ku, Sendai, Regional Head Office president: Mikio Kashima), Check the winter tire installation status and ask the customer to install it early. Therefore, Expressway in major interchanges (IC), has implemented the mounting survey of winter tire in the early winter period.
The results of the survey conducted on November 17 are shown in the table below.
Compared to the previous survey (conducted on November 10th), the winter tire installation rate is higher, but compared to the same period last year, the overall installation rate is low.
The Tohoku region is approaching a full-blown snow season, and the possibility of snow accumulation on the roads in the plains as well as in the mountains increases. Please wear early winter tires and drive safely.
The next survey is scheduled for November 25th.
| Survey location | Winter tire installation rate | 【reference】 Same period last year (November 19th) | |
|---|---|---|---|
| This time survey (November 17) | Last survey (November 10) | ||
| Tohoku Expressway Aomori IC | 67% | 58% | 100% |
| Tohoku Expressway Towada IC | 75% | 43% | 98% |
| Hachinohe Road Hachinohe IC | 60% | 47% | 85% |
| Akita Expressway Akita Minami IC | 70% | 31% | 96% |
| Akita Michi Yokote IC | 82% | 47% | 100% |
| Tohoku Expressway Morioka South IC | 49% | 27% | 86% |
| Tohoku Expressway north Ezuriko IC | 50% | twenty four% | 88% |
| Tohoku Expressway Furukawa IC | 17% | 11% | 90% |
| Tohoku Expressway Sendai Miyagi IC | 36% | 5% | 35% |
| Yamagata Expressway Yamagata Kita IC | 35% | 23% | 75% |
| Yamagata Expressway Tsuruoka IC | 72% | 30% | 88% |
| Tohoku Expressway Fukushima Iizaka IC | 20% | 15% | 50% |
| Tohoku Expressway Koriyama IC | 23% | 22% | 31% |
| Ban-Etsu Expressway Aizuwakamatsu IC | 28% | 8% | 63% |
| Joban Expressway Iwaki Chuo IC | 22% | 8% | 6% |
| Tohoku Regional Head Office | 43% | 23% | 69% |
- Survey method: Visually inspect the tire type of the vehicle passing through the toll booth.
(One time: about 100 units or 30 to 60 minutes)
- This material has been updated to the latest data as a supplementary material to the press release “On the start of winter tire installation status surveys on Expressway” (November 7, 2008).
関連サイト・コンテンツ
料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。
リアルタイムの渋滞・規制情報をお探しの方はこちら。
災害時の通行止めなどの道路情報をお探しの方はこちら。