About result of winter tire wearing situation investigation on Expressway
-For November 25, 2008-
- Corporate Top
- Press Room
- Press Release Tohoku office
- About result of winter tire wearing situation investigation on Expressway
November 27, 2008
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Regional Head Office (Aoba-ku, Sendai, Regional Head Office president: Mikio Kashima), Check the winter tire installation status and ask the customer to install it early. Therefore, Expressway in major interchanges (IC), has implemented the mounting survey of winter tire in the early winter period.
The results of the survey conducted on November 25 are as shown in the table below.
Due to snowfall in the Tohoku region last week, the winter tire installation rate has increased significantly.
[About frequent accidents during snowfall]
There were 51 accidents (according to our research) on Expressway in the six prefectures of Tohoku from November 19th to 20th when heavy snowfall occurred. About 30% of them were running on summer tires.
It will soon be a full-fledged snow season, Please wear a winter tire early and drive safely. In addition, many accidents seem unfamiliar with driving on snowy roads, so please drive more carefully.
The next survey is scheduled for December 1st.
| Survey location | Winter tire installation rate | 【reference】 Same period last year (November 26) | |
|---|---|---|---|
| This time survey (Nov. 25) | Last survey (November 17) | ||
| Tohoku Expressway Aomori IC | 100% | 67% | 100% |
| Tohoku Expressway Towada IC | 93% | 75% | 100% |
| Hachinohe Road Hachinohe IC | 92% | 60% | 98% |
| Akita Expressway Akita Minami IC | 95% | 70% | 95% |
| Akita Michi Yokote IC | 100% | 82% | 100% |
| Tohoku Expressway Morioka South IC | 90% | 49% | 99% |
| Tohoku Expressway north Ezuriko IC | 100% | 50% | 96% |
| Tohoku Expressway Furukawa IC | 72% | 17% | 93% |
| Tohoku Expressway Sendai Miyagi IC | 74% | 36% | 84% |
| Yamagata Expressway Yamagata Kita IC | 98% | 35% | 88% |
| Yamagata Expressway Tsuruoka IC | 96% | 72% | 100% |
| Tohoku Expressway Fukushima Iizaka IC | 67% | 20% | 85% |
| Tohoku Expressway Koriyama IC | 73% | 23% | 51% |
| Ban-Etsu Expressway Aizuwakamatsu IC | 79% | 28% | 98% |
| Joban Expressway Iwaki Chuo IC | 31% | 22% | 16% |
| Tohoku | 81% | 43% | 84% |
- Survey method: Visually inspect the tire type of the vehicle passing through the toll booth.
(One time: about 100 units or 30 to 60 minutes) - This material has been updated to the latest data as a supplementary material to the press release “On the start of winter tire installation status surveys on Expressway” (November 7, 2008).
関連サイト・コンテンツ
料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。
リアルタイムの渋滞・規制情報をお探しの方はこちら。
災害時の通行止めなどの道路情報をお探しの方はこちら。