Results of winter tire installation survey (5th)

December 1, 2010
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Regional Head Office (Aoba Ward, Sendai City), the winter tires on Expressway are being promoted in order to encourage early winter tire replacement and enlighten safe driving during the full-scale snow season. We have conducted a survey on the installation status of and announced the results.

The results of the survey conducted on November 29 are as shown in the table below.

Compared to the previous survey (conducted on November 22nd) in the entire Tohoku region, the winter tire installation rate increased due to snowfall in the northeastern north (Aomori/Akita/Iwate) and Yamagata prefecture. It is a standard. On the other hand, in Miyagi and Fukushima prefectures where there is still no snowfall, the installation rate is lower than last year.

We expect full-scale snowfall in Tohoku from now on, so please drive safely with early winter tires.

Survey location Winter tire installation rate 【reference】
This time survey
(November 29)
Last survey
(November 22)
Same period last year (November 30)
Aomori Prefecture Tohoku Expressway Aomori IC 95% 77% 97%
Hachinohe Road Hachinohe IC 81% 57% 85%
Akita Tohoku Expressway Towada IC 97% 76% 94%
Akita Expressway Akita Minami IC 96% 65% 92%
Akita Michi Yokote IC 100% 60% 100%
Iwate Prefecture Tohoku Expressway Morioka South IC 84% 64% 76%
Tohoku Expressway north Ezuriko IC 78% 60% 95%
Miyagi Prefecture Tohoku Expressway Furukawa IC 91% 32% 64%
Tohoku Expressway Sendai Miyagi IC 61% 41% 85%
Yamagata Prefecture Yamagata Expressway Yamagata Kita IC 88% 65% 88%
Yamagata Road Kushibiki PA 93% 73% 84%
Fukushima Prefecture Tohoku Expressway Fukushima Iizaka IC 60% 32% 51%
Tohoku Expressway Koriyama IC 43% 39% 61%
Ban-Etsu Expressway Aizuwakamatsu IC 65% 38% 88%
Joban Expressway Iwaki Chuo IC 27% 33% 36%
Tohoku Regional Head Office 77% 54% 80%

The next survey is scheduled for December 6 (published December 8).
(The survey date and publication date are subject to change without notice due to weather conditions.)

  • Survey method: Visually check the tire type of the vehicle passing through the general lane at the tollgate. (One time: 100 units or 30 minutes or more)
  • "IC" stands for interchange, "PA" stands for parking area.

This document is based on a press release "About the results of the winter tire installation situation survey (first)-Starting efforts to promote early replacement of winter tires-(November 4, 2010)" It is a continuous survey.

Image of Dr. Mammoshi

In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".

* Dr. Mammoshi: A researcher specializing in car and snow road safety

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.