About result of winter tire wearing situation investigation (fourth)
-Promotion of early replacement of winter tires and safe driving on snow roads-
- Corporate Top
- Press Room
- Press Release Tohoku office
- About result of winter tire wearing situation investigation (fourth)
November 24, 2016
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Branch (Sendai-shi Aoba-ku), aiming at the early winter tire replacement, will aim to raise a safe driving of snow road driving, in the coming snowfall period, for winter use on expressway We will investigate the mounting condition of the tire and announce the result.
Compared with the survey conducted on the same period last year (conducted on November 24), the winter tire installation rate is high throughout the Tohoku region.
However, about 31% of customers have not yet installed winter tires. Please change to early winter tires before the start of full-scale winter, and drive safely when using the Expressway.
1 Survey results on Monday, November 21
Survey location | Winter tire installation rate | Number of surveys this time | JMA observation data | ||||
---|---|---|---|---|---|---|---|
This time survey (November 21) |
Last survey (November 14) |
[Last year's survey] (November 24) |
Winter tires Number of installed |
Total number | First snow day (Observation point) |
||
Aomori Prefecture | Tohoku Expressway Aomori IC | 100% | 93% | 95% | 22 | 22 | [Aomori City] Last year: November 28 This year: November 6 Normal year: November 6 |
Hachinohe Road Hachinohe IC | 100% | 96% | 82% | 26 | 26 | ||
Aomori prefecture total | 100% | 95% | 89% | 48 | 48 | ||
Akita | Tohoku Expressway Hanawa SA (below) | 93% | 82% | (Note) 89% | 40 | 43 | [Akita City] Last year: November 28 This year: November 9 Normal year: November 13 |
Akita Expressway Akita Minami IC | 86% | 85% | 63% | 32 | 37 | ||
Akita Michi Yokote IC | 98% | 81% | 79% | 55 | 56 | ||
Akita prefecture total | 93% | 83% | 76% | 127 | 136 | ||
Iwate Prefecture | Tohoku Expressway Morioka South IC | 83% | 55% | 82% | 91 | 110 | [Morioka City] Last year: November 23 This year: November 9 Normal year: November 8 |
Tohoku Expressway north Ezuriko IC | 77% | 67% | 79% | 23 | 30 | ||
Iwate prefecture total | 81% | 58% | 81% | 114 | 140 | ||
Miyagi Prefecture | Tohoku Expressway Sendai Miyagi IC | 57% | 35% | 63% | 77 | 135 | 【Sendai city】 Last year: November 25 This year: unobserved Normal year: November 24 |
Sendai-Tobu Road Sendai East IC | 46% | 54% | ー | 46 | 99 | ||
Miyagi prefecture total | 53% | 46% | 63% | 123 | 234 | ||
Yamagata Prefecture | Yamagata Expressway Yamagata Kita IC | 69% | 61% | 45% | 31 | 45 | [Yamagata City] Last year: November 25 This year: November 9 Normal year: November 18 |
Yamagata Road Kushibiki PA (above) | 96% | 85% | 65% | 23 | 24 | ||
Yamagata total | 78% | 69% | 51% | 54 | 69 | ||
Fukushima Prefecture | Tohoku Expressway Fukushima Iizaka IC | 72% | 72% | 66% | 51 | 71 | [Fukushima City] Last year: November 25 This year: unobserved Normal year: November 26 |
Tohoku Expressway Koriyama IC | 69% | 59% | 36% | 72 | 105 | ||
Ban-Etsu Expressway Aizuwakamatsu IC | 94% | 37% | 63% | 59 | 63 | ||
Joban Expressway Iwaki Chuo IC | 21% | 15% | 10% | 21 | 100 | ||
Fukushima Prefecture total | 60% | 42% | 40% | 203 | 339 | ||
Tohoku Regional Head Office | 69% | 56% | 60% | 669 | 966 |
Note) Results from the Towada IC survey.
- Survey method: Visually check the tire type of the vehicle passing through the general lane at the tollgate. (100 units or 60 minutes each time)
- “IC” is an interchange, “SA” is a service area, and “PA” is a parking area.
- About the first snow day, it is the information as of the survey date.
The next survey is scheduled for Monday, November 28 (announced Wednesday, November 30).
(The survey date and publication date are subject to change without notice due to weather and other reasons.)
This document is based on a press release "About the results of the winter tire installation situation survey (first step)-Promotion of early winter tire replacement and the first report of safe driving on snowy roads-(November 2, 2016)" It is a continuous survey of.
2 Request from NEXCO EAST Tohoku Branch
- Please put on early winter tires before snowfall.
Summer tires tend to slip on snowy roads, and slip accidents on winter roads can lead to serious accidents, so please replace them with winter tires early. - "Slow and safe driving on snowy roads" please. Reference Material-1 [PDF: 208KB]
When driving on a snowy road at the beginning of the season, the feeling of safe driving on the snowy road may not be restored.Therefore, even with the winter tires installed, keep a sufficient distance between cars to keep the speed down and to handle suddenly. Please drive slowly and safely without using sudden braking. - "Frequently gathering information before and after going out" please. Reference Material-2 [PDF: 683KB]
The weather on the Expressway changes rapidly in winter, so be sure to check the road and weather information before and during your trip.
In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".
* Dr. Mammoshi: A researcher specializing in car and snow road safety
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.