[E4] About the prospect of closing the Tohoku Expressway Shirakawa Chuo Smart Interchange (In-bound)

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4] About the prospect of closing the Tohoku Expressway Shirakawa Chuo Smart Interchange (In-bound)

The latest regulatory information isDraTraPlease see.

October 23, 1st 2019
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

 E4 Tohoku Expressway Shirakawa central smart interchange (SIC) In-bound in the line, but closed due to the impact of typhoon No. 19, has had been followed, 2019 that it has become the expected to release the closure at October 24 6 I will let you know.

IC to unlock

 E4 Tohoku Expressway Shirakawa Chuo SIC In-bound Line
(Out-bound line is still available)

Date and time of closing

Thursday, October 24, 1st 2019

Location map

Image of position map

Local situation

[Damage situation as of October 13]
Photograph of [damage situation as of October 13]
[Recovery status as of October 20]
[Recovery status as of October 20]

Latest traffic conditions

Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。