[E7] Akita Expressway (between Akita Kita IC and Gojome Hachirogata IC)
Implementation of nighttime traffic closure and one-sided alternating traffic regulation

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Akita Expressway (between Akita Kita IC and Gojome-Hachirogata IC) Nighttime traffic closure and one-sided alternate traffic regulation

Due to the press release "[E7] Akita Expressway (between Kotooka Moridake IC and Hachiryu IC) emergency night traffic closure and one-sided alternate traffic regulation", the work from July 19 to 21 will be postponed.

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 647KB]

May 24, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita management office

NEXCO EAST Akita Management Office (Akita City, Akita Prefecture) is located on the E7 Akita Expressway Akita Kita Interchange (IC) on the provisional two-lane section (one lane on each side). ) At the IC, due to pavement repair work, etc., we will implement nighttime traffic closure and one-sided alternate traffic regulation (waiting time up to 15 minutes) as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please make a detour to National Highway No. 7.
In addition, we plan to continue to close the road at night after August 16, 1991. Please note that we will inform you again as soon as the schedule is decided.
Expressway to the customers, which is available sorry now decided to apologize for inconvenience, Expressway to construction work required in order to use the safe and comfortable, thank you for your understanding and cooperation.

1. Closed section

[1] Between Showa-Ogahanto IC and Gojome-Hachirogata IC on the Akita Expressway
[2] Between Akita Kita IC and Gojome-Hachirogata IC on the Akita Expressway
Attachment-1, 2 [PDF: 239KB]

2. One-sided alternating traffic regulation section

[3] Between Showa-Ogahanjima IC and Gojome-Hachirogata IC on the Akita Expressway

(Location map)

Image of (position map)
Processed by East Nippon Expressway Company based on the Geographical Survey Institute map (Geographical Survey Institute) (http://maps.gsi.go.jp/)

3. 3. Date and time of each traffic regulation

Night traffic

  • [1] Showa Oga Peninsula IC-Gojome Hachirogata IC (upper and lower lines)
    • June 7th (Monday) to 11th (Friday), 3rd year of Reiwa
      Every night from 20:00 to 6:00 the next day
  • [2] Between Akita Kita IC and Gojome Hachirogata IC (upper and lower lines)
    • June 14th (Monday) -July 30th (Friday), 3rd year of Reiwa
      Every night from 20:00 to 6:00 the next day
  • The night traffic will be closed from 20:00 on weekdays to 6:00 the next day.
    (Friday night work will be done until 6 am on Saturday)

Alternate traffic regulation on one side

  • [3] Showa Oga Peninsula IC-Gojome Hachirogata IC (upper and lower lines)
    • June 14th (Monday) -July 30th (Friday), 3rd year of Reiwa
      Every day from 6:00 to 20:00
  • The waiting time can be up to 15 minutes. (Excluding Saturdays and Sundays)
    If you want to bypass the general road,
    Attachment-1 [PDF: 158KB])Please refer to the.
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image image of each traffic regulation date and time

Four. Detour

Closed section [1]
National highway No. 7, prefectural highway No. 37 (Attachment-1 [PDF: 158KB])

Closed section [2]
Prefectural Road 41, National Road 7, Prefectural Road 37 (Attachment-2 [PDF: 157KB])

Five. Construction details

Pavement repair work

We will repair the pavement of the provisional two-lane section and install a wire rope to the median strip.

Photograph of pavement repair work [before construction]
[Before construction]
Photograph of pavement repair work [after construction (image)]
[After construction (image)]

Kodobashi repair work

Expressway and take measures to prevent them from falling off.

Photograph of this road bridge repair work [before construction]
[Before construction]
Photograph of this road bridge repair work [after construction (image)]
[After construction (image)]

6. About transfer fee adjustment due to traffic closure

Attachment-3, 4 [PDF: 199KB]

For passengers who leave the Expressway once due to a nighttime suspension and bypass the closed section and transfer again in the same direction, we will make a "transit adjustment" to adjust the toll according to the section used.

7. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • ハイウェイテレホン
    電話でリアルタイムの交通情報(5分更新)を24時間入手できます。
    【電話番号】
    秋田局 018-826-1620
    (携帯電話短縮ダイヤル #8162
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666 (携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    秋田情報 050-3369-6605
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.