[E7] Akita Expressway (between Gojome Hachirogata IC and Hachiryu IC)
Implementation of nighttime closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Akita Expressway (between Gojome Hachirogata IC and Hachiryu IC) Nighttime closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF:546KB]

September 13, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita management office

NEXCO EAST Akita Management Office (Akita City, Akita Prefecture) is located on the E7 Akita Expressway Gojome Hachirogata Interchange (IC) on the provisional two-lane section (one lane on each side) to the Hachiryu IC. In, due to pavement repair work and wire rope type lane division fence installation work, we will implement nighttime closure as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please make a detour to National Highway No. 7.
Expressway to the customers, which is available sorry now decided to apologize for inconvenience, Expressway to construction work required in order to use the safe and comfortable, thank you for your understanding and cooperation.

1. Closed section

Between Gojome Hachirogata IC and Hachiryu IC on the Akita Expressway
Attachment [PDF: 208KB]

(Location map)
Image of (position map)

2. Closed date and time

 令和3年10月11日(月)~22日(金)
 毎夜20時~翌6時
 【予備日:10月25日(月)~11月5日(金)】

  • Night closures will be closed from 20:00 on weekdays to 6:00 the next morning.
    (Friday night work will be done until early Saturday morning, and night work on the day before the holiday will be done until early morning on the holiday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

3. Detour

Attachment [PDF: 208KB]

Prefectural road No. 15, national highway No. 7

Four. Construction content

Pavement repair work and wire rope type lane division fence installation work

We will repair damaged pavement and install wire rope lane division fences.

[Before construction] photo
[Before construction]
[Post-construction (image)] photo
[After construction (image)]

Five. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    秋田情報 050-3369-6605
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.