[E6] Sanriku Expressway / Sendai-Tobu Road
Implementation of night lamp closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Sanriku Expressway / Sendai-Tobu Road Night ramp closure

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 282KB】

June 22, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai East Management Office

NEXCO EAST Sendai East Management Office (Wakabayashi-ku, Sendai City) is the entrance and exit ramp of the E6 Sanriku Expressway Sendai Kohoku Interchange (IC) (upper and lower lines), E6 Sendai-Tobu Road Sendai Higashi IC ( The entrance ramp (Out-bound line) will be closed at night to repair damaged pavement.
Therefore, when you go out, please leave with plenty of time, and when you drive, please detour to national highway No. 45, prefectural road, etc.
We apologize for the inconvenience caused to customers who use the Expressway, but we ask for your understanding and cooperation in the construction work necessary to use the Expressway safely and comfortably.

1. Closed place

[1] Sanriku Expressway Sendai Kohoku IC Vertical Line Entrance / Exit Lamp
[2] Sendai-Tobu Road Sendai East IC Out-bound Line Entrance Ramp

(Location map)
Image of (position map)

[1] Sanriku Expressway Sendai Kohoku IC, [2] Sendai Tobu Sendai-Tobu Road Sendai East IC Night closure details

[1] Image image of Sanriku Expressway Sendai Kohoku IC night closure detailed map
[2] Sendai-Tobu Road Sendai Higashi IC Night closure image image

2. Closing date and time

  • [1] Sanriku Expressway Sendai Kohoku IC Vertical Line Entrance / Exit Lamp
    • July 14th (Thursday) and 15th (Friday), 4th year of Reiwa
      Every night from 20:00 to 5:00 the next day [2 nights]
  • [2] Sendai-Tobu Road Sendai East IC Out-bound Line Entrance Ramp
    • July 19, 4th year of Reiwa (Tuesday)
      From 20:00 to 5:00 the next day [1 night]
  • [Preliminary day: Wednesday, July 20th to Friday, July 22nd, 4th year of Reiwa]
  • The nighttime closure will be from 20:00 on weekdays to 5:00 the next morning.
    (Friday night construction will be done until 5 am on Saturday)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closing date

3. Detour

  • [1] Sanriku Expressway Sendai Kohoku IC Vertical Line Entrance / Exit Lamp
  • [2] Sendai-Tobu Road Sendai East IC Out-bound Line Entrance Ramp

Four. Construction content

Pavement repair work

We will repair the damaged pavement.

Photograph of pavement repair area
Pavement repair location
Photo of repair image
Repair image

Five. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666 (携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    東北地方・宮城情報 050-3369-6604
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.