[E7] Akita Expressway (both inbound and outbound) Showa Oga Peninsula IC to Gojome Hachirogata IC
Nighttime road closure notice

September 1st (Monday) to September 2nd (Tuesday) from 8:00 PM to 6:00 AM the following morning
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Akita Expressway upper and lower lanes, Showa Oga Peninsula IC to Gojome Hachirogata IC Nighttime road closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 458KB]

August 1, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST The Akita Management Office (Akita City, Akita Prefecture) will close the E7 Akita Expressway (hereinafter referred to as "Akita Road") up and down line from the Showa-Oga-Hantou Interchange (hereinafter referred to as "IC") to the Gojome-Hachirogata IC during the night for pavement repair work and other reasons.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing extra time for your trip.

1. Closed section and date and time

  1. Closed section
    [1] Akita Expressway, both inbound and outbound lanes, Showa Oga Peninsula IC to Gojome Hachirogata IC
  2. Image image of closed section
    • The signs such as E7 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and Time
    [1] Akita Expressway, both inbound and outbound lanes, Showa Oga Peninsula IC to Gojome Hachirogata IC
    Implementation date:
    September 1st (Monday) to September 2nd (Tuesday), 2020
    Every day from 20:00 to 6:00 the next morning
    Preparation day:
    Wednesday, September 3, 2020 - Thursday, September 4, 2020
    Every day from 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to Appendix 1 [PDF: 150KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, then re-enter and transfer in the same direction, we will implement a "transfer adjustment" in which the toll will be adjusted according to the section of the expressway they are using. (See Appendix 2 [PDF: 117KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.

Four. Construction overview

Akita Road Upper and Lower Lines Showa Oga Peninsula IC ~ Gojome Hachirogata IC, pavement repair work will be carried out because damage to the road surface has occurred. In order to avoid causing as much inconvenience as possible to customers, we will close the road on weekday nights when there is little traffic, and carry out the construction intensively and efficiently. This is a necessary construction work for you to use the Expressway safely and comfortably, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Image after pavement repair
Image after pavement repair

5. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • We will post posters and leaflets at toll booths and rest facilities in the surrounding area.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.