[E7] Akita Expressway both directions: Akita Minami IC to Gojome Hachirogata IC
Nighttime road closure notice

From Monday, June 22nd to Tuesday, July 7th, from 8 PM to 6 AM the following morning each day.
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Notice of nighttime road closure Akita Expressway (both directions) between Akita Minami IC and Gojome Hachirogata IC

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 818KB]

May 22, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST The Akita Management Office (Akita City, Akita Prefecture) will close the Akita Minami IC to Gojome-Hachirogata IC on the E7 Akita Expressway (hereinafter referred to as "Akita Road") up and down route during the night for pavement repair work.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in allowing extra time for the work.

1. Closed section and date and time

  1. Road closure section:
    [1] Akita Expressway, both directions, Akita Minami IC to Akita Chuo IC
    [2] Akita Expressway, both directions, Akita Chuo IC to Showa Oga Peninsula IC
    [3] Akita Expressway, both directions, Showa Oga Peninsula IC to Gojome Hachirogata IC
  2. Image image of closed section
    • The signs such as E7 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    • [1] Akita Expressway, both directions, Akita Minami IC to Akita Chuo IC
      Implementation date:
      Monday, June 22, 2020 - Tuesday, June 23, 2020
      Every day from 20:00 to 6:00 the next morning
      Preparation day:
      Wednesday, June 24, 2020 - Thursday, June 25, 2020
      Every day from 20:00 to 6:00 the next morning
    • [2] Akita Expressway, both directions, Akita Chuo IC to Showa Oga Peninsula IC
      Implementation date:
      Monday, June 29, 2020 - Wednesday, July 1, 2020
      Every day from 20:00 to 6:00 the next morning
      Preparation day:
      Thursday, July 2, 2020 - Friday, July 3, 2020
      Every day from 20:00 to 6:00 the next morning
    • [3] Akita Expressway, both directions, Showa Oga Peninsula IC to Gojome Hachirogata IC
      Implementation date:
      July 6th (Monday) to July 7th (Tuesday), 2020
      Every day from 20:00 to 6:00 the next morning
      Preparation day:
      Wednesday, July 8, 2020 - Thursday, July 9, 2020
      Every day from 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • The following parking areas (hereinafter referred to as "PA") located within the road closure section will be closed.
    Akita Expressway, both directions, Taiheizan PA (parking area)
    8 PM to 6 AM the following morning
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For information on alternative routes, please refer to Attachment 1 [PDF: 441KB].
The detour will increase your travel time, so please allow ample time for your journey.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, and then re-enter to continue their journey in the same direction, a "transfer adjustment" will be implemented to adjust the toll based on the section used. (See Attachment 2 [PDF: 185KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.
  • Nishisenboku Smart IC can only be used by ETC vehicles, but it is closed from 10pm to 6am the following day.

Four. Construction overview

Due to road surface damage occurring on the Akita Expressway both directions (up and down), Akita Minami IC ~ Gojome Hachirogata IC, we will carry out pavement repair work. To minimize inconvenience to customers, we close roads on weekday nights when traffic is low, allowing for concentrated and efficient construction. This construction is necessary to ensure safe and comfortable use of the Expressway, so we appreciate your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Image after pavement repair
Image after pavement repair

5. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.