[CA] Notice of resumption of nighttime closure of Tokyo Wan Aqua-Line Expressway

From January 31st (Monday) to February 3rd (Thursday), 4th year of Reiwa, from 23:00 pm to 5:00 the next morning
-Resuming tunnel fall prevention work and inspection of road structures-

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 560KB]

January 26, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Tokyo Wan Aqua-Line Expressway Management Office

At NEXCO EAST Tokyo Wan Aqua-Line Expressway Management Office (Kisarazu City, Chiba Prefecture), the following sections of CA Tokyo Wan Aqua-Line Expressway (hereinafter "Aqua Line") and CA Tokyo Wan Aqua-Line Expressway Access Road (hereinafter "Aqua Line") Therefore, it was scheduled to be closed from January 17th (Monday) to 24th (Monday) at night for tunnel fall prevention work and inspection of road structures, but on 17th (Monday) Due to a delay in the removal of structures during the nighttime closure, an event occurred in which the removal of the closure was delayed. In response to this event, it became necessary to review the construction method and the construction system due to the confirmation of new coronavirus-positive persons in the construction personnel, so the scheduled nighttime closure has been cancelled. I did.
We are pleased to inform you that the construction method and construction system will be reviewed and the nighttime closure will be resumed from January 31st (Monday).
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. Closed section and date and time

  1. Closed section
    Aqua Line Up and Down Line Kawasaki Ukishima JCT-Kisarazu Kaneda IC
    Aqua connecting road In-bound line Sodegaura IC ⇒ Kisarazu Kaneda IC
  2. Image image of closed section
    • The indication of CA etc. attached to each line shows the line number (numbering) of the Expressway
  3. Date and time
    • The implementation date will be changed due to a review of the construction method and construction system.
    Implementation date:
    January 17th (Monday) and 31st (Monday) -February 3rd (Thursday), 4th year of Reiwa
    Every day from 23:00 to 5:00 the next morning
    Preparation day:
    February 7th (Monday) to 9th (Wednesday), 4th year of Reiwa
    Every day from 23:00 to 5:00 the next morning
Image of closed days
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • Rest facilities within the closed section will be closed as follows.
    Aqualine Umihotaru Parking Area 21:00 pm to 5:00 the next morning
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the attached sheet [PDF: 263KB] for detouring.
The detour will take longer, so please leave plenty of time.

3. Construction overview

In order to keep the road structure in good condition at the Aqua Line, which has been open for 24 years, we will carry out tunnel fall prevention work and inspection of the road structure. Since it is not possible to carry out construction and inspection under normal lane regulations, it is necessary to close the road and carry out the work.
Therefore, in order to avoid inconvenience to customers as much as possible, we will close traffic on weekday nights when traffic is light and carry out construction intensively and efficiently. We ask for your understanding and cooperation as this work is necessary to use the Expressway safely and comfortably.

Image of structure inspection status Image 1
Image of structure inspection status Image 2

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.