Congestion prediction of Expressway during Obon period [Hokkaido version]

~The peak of congestion is Wednesday, August 14th and Thursday, August~

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Congestion prediction of Expressway during Obon period [Hokkaido version]

July 12, 2013
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

NEXCO EAST Hokkaido Regional Head Office (Atsubetsu Ward, Sapporo City) has summarized congestion congestion due to traffic concentration on Expressway in Hokkaido during the Obon period [August 8 (Thu)-August 18 (Sun)] and its countermeasures.

Congestion forecast

This congestion forecast is based on the traffic conditions during the past Bon Festival and this year's Golden Week. ( Attachment 1 [PDF: 49KB] reference)

  • We predict that the peak of congestion will be August 14 (Wednesday) and August 15 (Thursday).
  • The Hokkaido Expressway predicts traffic congestion of up to 5km between Kitahiroshima IC and Eniwa IC (direction Chitose) on Wednesday, August 14th and Thursday, August 15th.
  • The Futaru Expressway predicts a 3km traffic jam at the Asari Main Line toll gate (Otaru direction).
  • Doto Expressway is expected to experience congestion and congestion between Shimukappu IC and Tomamu IC in both Sapporo and Obihiro directions. In addition, at night on Tuesday, the 13th, customers returning from the Katsu every fireworks display predict a maximum of 5km of traffic congestion near the Obihiro JCT (toward Sapporo).

Congestion measures

Regarding congestion measures during the Obon period, we plan to implement the following measures. (Attachment 2 [PDF: 126KB] reference)
・Providing traffic congestion information and warnings for rear-end collisions at the end of traffic congestion
・Placement of parking lot organizers and restrooms at rest facilities

  • Please use this congestion forecast to avoid congestion by shifting the customer's use date and departure time before and after the expected time of congestion.
  • Excessive speed will cause an accident. Please keep a sufficient distance between cars and drive at a safe speed suitable for the road conditions. If you feel tired, don't overdo it and try to take an early break at the rest facility.
  • Please check the latest road traffic information before departure as the traffic conditions may change significantly due to accidents and weather.
  • On Saturday 13th July, the first gas station will open on both sides of the Yuni parking area (upper and lower lines) on the Doto Expressway. Refueling is not possible immediately on Expressway. Be sure to inspect the vehicle (oil, tires, cooling water, etc.) before departure. (Attachment 3 [PDF: 111KB] reference)

Traffic information before going out

  • Expressway traffic information service "Drive Traffic (DraTra)"
    Expressway and real-time road traffic conditions and congestion prediction information, available on the Internet.
    It can be viewed from a computer, tablet, mobile phone, or smartphone terminal.
    Please use the Expressway traffic information service provided by NEXCO EAST.

    " DraTra (Drive Traffic)"
    computer(http://www.drivetraffic.jp/)
    Smartphone/Tablet (http://www.drivetraffic.jp/smp/)
    Mobile phone (http://m.drivetraffic.jp/)

    *When you access "DraTra", the top page for each device you use will be displayed. Please note that the PC page may be displayed depending on the device.

  • ハイウェイテレホン
    011-896-1620(札幌)
    0143-59-1620(室蘭)
    0166-54-1620(旭川)
    0155-42-1620(帯広)
    ・携帯電話からは『#8162』で最寄の高速道路のハイウェイテレホンを聞くことが出来ます。

  • (財)日本道路交通情報センター
    ・電話番号:050-3369-6760

(Reference) Obon calendar

(Reference) Image of Obon Calendar

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.