Notice of night exit of Gaikan Expressway closed

~We will perform pavement repair work, sign replacement work, and facility equipment work from Monday, May 11th, 2015 to Thursday, July 16th (including preliminary days)~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Notice of night exit of Gaikan Expressway closed

April 30, 2015
East Nippon Expressway Co., Ltd.
Misato Management Office

(Added on June 8, 2015)
Today (June 8th), we were planning from 23:00 to 4:00 the next day, the suspension of the Soka IC exit (inner loop) of the outer ring road was due to stormy weather at the same time on Wednesday, July 1st. I postponed.
We apologize for the inconvenience and ask for your understanding and cooperation.
(Added on May 20, 2015)
Today (May 20th), we were planning from 20:00 to 5pm the next day, the outer ring road Wako IC exit (inner ring) will be closed due to stormy weather, and it will be the same time on May 21th (Thursday) tomorrow. Postponed to
We apologize for the inconvenience and ask for your understanding and cooperation.
(Added May 18, 2015)
Today (May 18th), we were planning from 20:00 to 5am the next day, the closure of the outer ring road Wako IC exit (inner circle) was closed due to stormy weather, and the same time on May 19th (Tuesday) tomorrow. Postponed to
We apologize for the inconvenience and ask for your understanding and cooperation.

NEXCO EAST Misato management office (Saitama Misato City), the Gaikan Expressway (outer ring road) Wako interchange IC ~ Misato between the west IC, do the nighttime exit closed due to construction work.

In this work, we will repair pavement damage, replace old sign boards, and install facility equipment. Before going out, please confirm the construction site (exit closing point), the construction date, the closing time zone, and the detour, and make sure you have a generous operation plan. We apologize for the inconvenience, and we appreciate your understanding and cooperation.

1 Construction overview

Construction sectionOuter Ring Road Between Wako IC and Outer Ring Misato West IC
Construction contentWe will perform pavement repair work, sign board replacement work, and facility equipment work. Details of each construction Attachment 1 [PDF: 515KB] Please refer to.
Construction periodImage image of construction period
  • In case of stormy weather, construction will be postponed to the spare day.
  • For the latest information, please check the NEXCO EAST Road Information Site "DraTra".

(1) Construction location and implementation date

  • Outer Ring Misato West IC Outer Circulation From May 11 (Monday) 20:00 to May 12 (Tue) 5:00
    Preparation day
    From May 12 (Tue) 20:00 to May 13 (Wed) 5:00
    From Wednesday, May 13 at 20:00 to Thursday, May 14 at 5:00
    From Thursday, May 14 at 20:00 to Friday, May 15 at 5:00

    *In case of stormy weather, construction will be postponed to the spare day.
  • Wako IC exit inner circle From May 18, 2015 (Monday) 20:00 to May 19, Tuesday (Tue) 5:00
    From Tuesday, May 19, 2015, 20:00 to Wednesday, May 20, 2015, 5:00

    Preparation day
    From Wednesday, May 20, 20:00 to Thursday, May 21, 5:00
    From Thursday, May 21 at 20:00 to Friday, May 22 at 5:00

    *In case of stormy weather, construction will be postponed to the spare day.
  • Wako IC exit inner circle From 20:00 on Monday, May 25, 2015 to 5:00 on Tuesday, May 26
    Preparation day
    From Tuesday, May 26, 20:00 to Wednesday, May 27, 5:00
    From Wednesday, May 27, 20:00 to Thursday, May 28, 5:00
    From Thursday, May 28, 20:00 to Friday, May 29, 5:00

    *In case of stormy weather, construction will be postponed to the spare day.
  • Wako IC exit roundabout from 13:00 on Monday, June 1, 2015 to 4:00 on Tuesday, June 2
  • Soka IC Exit Outer Round From 23:00, Wednesday, June 3, 2015 to 4:00, Thursday, June 4, 2015
  • Soka IC exit inner circle From 23:00 on Monday, June 8, 2015 to 4:00 on Tuesday, June 9
  • Kawaguchi Higashi IC exit inner circle From 23:00 on Wednesday, June 10, 2015 to 4:00 on Thursday, June 11
  • Kawaguchi West IC Exit Outer Tour From Monday, June 15, 2015 23:00 to Tuesday, June 16 4:00
  • Outer ring Urawa IC exit inner circle From Wednesday, June 17, 2015 23:00 to Thursday, June 18 4:00
  • Toda West IC Exit Outer Round From 22:00 on Monday, June 22, 2015 to 4:00 on Tuesday, June 23
  • Toda Higashi IC exit inner circle From Wednesday, June 24, 2015 23:00 to Thursday, June 25, 4:00
  • Wako Kita IC exit inner circle From 23:00 on Monday, June 29, 2015 to 4:00 on Tuesday, June 30
    Reserve day (4-12)
    From Wednesday, July 1 23:00 to Thursday, July 2 4:00
    From Monday, July 6th 23:00 to Tuesday, July 7th 4:00
    From Wednesday, July 8 23:00 to Thursday, July 9 4:00
    From Monday, July 13 23:00 to Tuesday, July 14 4:00
    From Wednesday, July 15 23:00 to Thursday, July 16 4:00

    *In case of stormy weather, construction will be postponed to the spare day.

(2) Construction position

Image of construction position

2 Request for detour

Please use public transportation or make a detour to a general road while the IC exit at night is closed due to this construction. The detour is Attachment 2 [PDF: 720KB] Please refer to.

Please note that an additional charge will apply if you use the Metropolitan Expressway from Kawaguchi JCT and Bijogi JCT.

3 How to obtain traffic information

(1) Information for exit closure

  • We will post and distribute posters and leaflets in the service area (SA), parking area (PA), etc.

(2) Road traffic information that can be obtained before going out

  • NEXCO東日本お客さまセンター
    ナビダイヤル:0570-024-024 (24時間オペレーターが対応)
    TEL:03-5338-7524 (PHS、IP電話のお客さま)
  • NEXCO EAST Road Traffic Information Site "DraTra "
    [PC] http://www.drivetraffic.jp/
    [Mobile] http://m.drivetraffic.jp/
  • For the latest regulatory information, see DraTra "Please refer to the.
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    ※全国どこからでも最寄りの情報センターに接続します。
    ※PHS、IP電話など一部の電話からはご利用できません。
    全国・関東甲信越情報 050-3369-6600
    インターネット
  • ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
    大泉局 03-3922-1620
    所沢局 04-2946-1620

(3) Road traffic information available while driving

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
  • LED display board
    We have installed an LED display board on the shoulder of the Expressway notify the closure on the day before and when it closes.
    (Installation on the day before closing will be the same time as the scheduled closing time on Friday of the previous week if it is implemented on Monday, and the same time as the scheduled closing time on Tuesday the previous day if it is implemented on Wednesday)
* Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto ) Also distributes information.
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.