"Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- "Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"
November 18, 2019
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office
E18 Joshin-Etsu Expressway Usui-Karuizawa IC-Saku IC is currently operating in two-way traffic (one lane each up and down) using the In-bound line due to the embankment deformation caused by typhoon No. 19. I will.
4 Toward the traffic resumed in the lane, "according to the experts Joshin-Etsu Expressway, Nagano Expressway in Slope measures and Technical Review Board", and to consider the recovery method of the relevant section (Usui Karuizawa IC ~ Saku IC), the first The technical study meeting will be held as follows.
1 date and time
Technical Study Group 2019 November 19, 1945 (Tuesday) 13: 20-15: 20
2 places
East Nippon Expressway Co., Ltd. Saku Management Office Meeting Room
3 members
Attachment [PDF: 49.6KB] As of
4 proceedings
- Field survey results
- First-aid measures and dynamic observation results
- Future recovery policy, etc.
5 Other
- The study meeting will be held privately.
- After the study meeting is held, the results of the study will be announced.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.