"Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • "Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"

November 18, 2019
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

 E18 Joshin-Etsu Expressway Usui-Karuizawa IC-Saku IC is currently operating in two-way traffic (one lane each up and down) using the In-bound line due to the embankment deformation caused by typhoon No. 19. I will.
4 Toward the traffic resumed in the lane, "according to the experts Joshin-Etsu Expressway, Nagano Expressway in Slope measures and Technical Review Board", and to consider the recovery method of the relevant section (Usui Karuizawa IC ~ Saku IC), the first The technical study meeting will be held as follows.

1 date and time

Technical Study Group 2019 November 19, 1945 (Tuesday) 13: 20-15: 20

2 places

East Nippon Expressway Co., Ltd. Saku Management Office Meeting Room

3 members

 Attachment [PDF: 49.6KB] As of

4 proceedings

  • Field survey results
  • First-aid measures and dynamic observation results
  • Future recovery policy, etc.

5 Other

  • The study meeting will be held privately.
  • After the study meeting is held, the results of the study will be announced.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.