[E4] Notice of closure of night ramp on Tohoku Expressway

-Repair damaged pavement and bridges and work to prevent reverse driving-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E4] Notice of closure of night ramp on Tohoku Expressway

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 721KB]

January 19, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Kazo Management Office

At the NEXCO EAST Kazo Management Office (Kazo City, Saitama Prefecture), damaged pavement at the E4 Tohoku Expressway (hereinafter "Tohoku Expressway Expressway") Hanyu Interchange (hereinafter "IC") and Iwatsuki IC.・ We will close the lamp at night to repair the bridge and take measures to prevent reverse running.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. Lamp closure location and date and time

number Road name Closed point period Attachment
E4 Tohoku Expressway [Hanyu IC]
Entrance ramp flowing into the In-bound line (toward Tokyo)
February 7 (Monday)
From 20:00 to 6:00 the next morning
Document 1-① [PDF: 205KB]
[Hanyu IC]
Exit ramp that flows out from the upper and lower lines (toward Tokyo and Utsunomiya)
Document 1-② [PDF: 207KB]
[Iwatsuki IC]
Exit ramp flowing out from the In-bound line (toward Utsunomiya)
February 10th (Thursday) and 14th (Monday)
From 21:00 pm to 5:00 the next morning
Document 2 [PDF: 173KB]
[Iwatsuki IC]
Entrance ramp flowing in from National Highway No. 16 (toward Kasukabe)
Thursday, February 10
From 21:00 pm to 5:00 the next morning
Document 3 [PDF: 219KB]
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
  • In stormy weather, it will be postponed to the preliminary day.
    Please see the attached document [PDF: 532KB] for detours when postponing.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.
Image image of lamp closing date and time

2. Construction overview

Since the road surface has been damaged at the entrance ramp of the Tohoku Expressway Hanyu IC and the exit ramp of the Iwatsuki IC, we will carry out pavement repair work. At the exit lamp of Hanyu IC, the expansion and contraction device main body installed at the joint between the bridges is damaged, so we will replace the expansion and contraction device.
In addition, at the entrance ramp of the Iwatsuki IC, we will carry out reverse-way driving countermeasure work (road marking, color pavement) to prevent accidents on the Expressway.
Since the section where this work is performed is one lane and construction cannot be done under normal lane regulations, it is necessary to close the lamp and perform the work.
Therefore, in order to avoid inconvenience to customers as much as possible, we will close the lamps on weekday nights when traffic is light and carry out construction intensively and efficiently. We ask for your understanding and cooperation as this work is necessary to use the Expressway safely and comfortably.

Hanyu IC pavement damage situation photo Image image of caption of Hanyu IC pavement damage situation
Pavement repair work work status photo Image of caption of work status for pavement repair work
Photograph of the image of reverse-way driving measures Image image of caption of reverse run countermeasure construction image

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs and posters will be posted at toll booths and rest facilities in the vicinity.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.